Safety as a Prime Consideration
Designs in the 1980's have a multitude of parameters from environmental, noise, aesthetics, planners, community groups, political influence and last but not least, legal/liability...

Infrastructure Decisions: Comments?Questions?Suggestions
The paper discusses some of the decisions that can or should be made when planning and operating infrastructure systems. Six classes of decisions are discussed: local considerations, local...

Micro-CAD: Can It Pay for Itself
A simple financial analysis is presented that forecasts the payback period on an investment in a microcomputer drafting system. The payback period is calculated in months using productivity...

The Role of the Resident Engineer
These proceedings include the papers presented at the specialty conference on resident engineers. The papers address different perceptions of the definition, qualifications, duties, responsibilities,...

Reducing Failures of Engineered Facilities
One of the most serious problems of modern professional practice is the collapse or malfunction of an engineered facility. The tragic consequences of this problem are all too familiar...

Construction Research Applied to Practice
The five papers compiled in these proceedings of the ASCE technical session Construction Research Applied to Practice represent important contributions to the construction industry. Four...

Avoiding Contract Disputes
Contract disputes among parties involved in the construction project are very expensive in both time and dollars. Owners, designers, construction managers and contractors all share in...

Fracture Problems in the Transportation Industry
Six cases of damage tolerance assessment are presented, involving structures or vehicles in the U.S. transportation industry. Damage tolerance means arranging design, maintenance, and...

Managing Computers
The papers in this book address the impacts of computers on the organization, the individual, and project management. On the organizational level, topics include managing the introduction...

Innovative Powerhouse Designs
Since 1978, interest in small scale hydroelectric projects in the U.S. has jumped to a new high. Both new sites and modification of existing dams have received scrutiny by both private...

Seismic Experience Data?Nuclear and Other Plants
The Seismic Qualification Utilities Group (SQUG) was formed to explore the use of earthquake experience data of equipment performance to resolve Nuclear Regulatory Commission (NRC) initiated...

Making Project Control Systems Work
This publication contains four papers that offer both theoretical and practical advice on how to make control systems more effective on design and construction projects. The use of automated...

Stormwater Detention Outlet Control Structures
The Hydraulics Division's Task Committee for the Design of Stormwater Detention Outlet Control Structures was formed to review and report on the state-of-the-art of stormwater...

Putting CADD to Work
Case histories show that engineering with CADD is no longer experimental. Projects reviewed in this article include an office/shop building for an electrical utility, a flood plain site...

Engineering with Spreadsheets
With an electronic spreadsheet, the geotechnical engineer has a powerful tool for solving routine engineering problems. The ability of the electronic spreadsheet to use the calculus of...

Project Management on a Micro
Increasingly, project management programs that once required the power of a mainframe computer are being modified to work on micros. Some of the programs being used at a number of firms...

Portables Pay Off
A portable microcomputer with appropriate software, utilities and copies of job related records can establish a field office for almost any project. Examples of applications for the onsite...

Accounting for CADD Center Costs
The purpose of developing a CADD cost center is to segregate all costs related to the CADD operation so that you may receive fair compensation for CADD usage and to ensure fair charges...

Second-Guessing the Engineer
The relationships between utilities and the bodies that regulate them have changed drastically in the past few years. No longer can any costs associated with the construction of new power...

Rail Planning�Texas Style
The Dallas Area Rapid Transit (DART) Authority has a 25 year plan to build a 147 mile rail network�all without federal funds. When DART hits its 2010 target date for completing the rail...

 

 

 

 