Nuclear Outages: An Approach to Project Controls
The nuclear refueling outage is short-lived, fast paced, and very costly to the nuclear utility. To better control modification expenses and reduce outage-related costs, utilities are...

Modifications At Operating Nuclear Power Plants
In these days of continuing regulatory requirement changes and high interest rates, the engineering of structural modifications for operating nuclear power plants has taken on greater...

Modifying Piping Systems During a Plant Outage
This paper describes methods to reduce problems in design and planning of modifications to piping systems during a nuclear plant outage. Significant differences between original design...

Intact Decommissioning Alternative for Nuclear Power Plants
Previous studies of decommissioning options for nuclear power plants have examined potential alternatives such as immediate dismantlement, entombment, and moth-balling. This paper describes...

Oconee Spent Fuel Rerack
Spent fuel storage problems facing electric utilities with nuclear generation are growing more critical as existing spent fuel storage capacity is utilized. Due to the inaccessibility...

Coping with Transition: Improving the Management Process
At Arkansas Power & Light Company, the Energy Supply Department has some 2,000 employees and operates (in addition to providing General Office engineering, technical, and administrative...

Project Management for the Upper Harlem Electrification Project
The Upper Harlem Electrification Project consists of a 28 mile extension of 700 V. D. C. under-running third (current carrying contact) rail electrification from North White Plains, New...

Seismic Probabilistic Risk Assessment for Critical Facilities
Probabilistic Risk Assessment (PRA) for seismic events is currently being performed for nuclear power plants. The background on seismic PRA is presented along with a basic description...

Arctic Foundation Selection: A Decision Matrix
An idealized matrix diagram is presented of the decision making process involved in determing an economic Arctic foundation type that is best suited to the proposed above-grade structure....

Watershed Management in 1985
Today's technology in subalpine watershed management is based on carefully designed watershed experiments beginning with Wagon Wheel Gap in 1909. Subsequent advances in process...

International and Educational Aspects of Watershed Management
International donor agencies involved in furnishing technical and economic assistance for increasing food and fiber production are focusing their attention towards rain-fed agricultural...

South Branch Rockaway Storm Water Management Study
The Division of Water Resources of the New Jersey Department of Environmental Protection, the Hunterdon Soil Conservation District, the United States Department of Agriculture's...

Crown Corporation Approach to Watershed Management
On July 1, 1984, the Government of Saskatchewan proclaimed the Water Corporation Act. The Act formed the legislative basis for the newly formed Saskatchewan Water Corporation and ushered...

Modelling Transpiration of Subalpine Trees in the Central Rocky Mountains
Forest evapotranspiration (ET) has long been recognized to be a major component in the mass water balance of subalpine watersheds in the central Rocky Mountains. In recent years, research...

Chaparral Watershed Management: A Systems Approach
The predicted environmental and economic effects of partial chaparral conversion for increased water yield on an experimental watershed in the Prescott National Forest, Arizona, are examined...

Mass. Municipal Watershed Management?Case Study
Most of the estimated 200,000 acres of municipally-owned watershed land in Massachusetts currently suffers from a lack of wise, multiple-use forest management which has resulted in lost...

An Annual Water Balance for a Surface Mining Overburden Waste Embankment
The embankment contained a volume of 257 thousand cubic yards and resulted from a phosphate surface mining operation in southeastern Idaho. The elevation of the embankment is about 7500...

The Improved SCS TR-20 Network Watershed Model
SCS Technical Release 20, 'Computer Program for Project Formulation - Hydrology' (TR-20), has been revised. Major revisions include new procedures for hydrograph...

Evaluation of Runoff Prediction Using Synthetic Rainfall and CREAMS
Of all the climatological data, rainfall is the variable to which a watershed responds most significantly. The amount and sequence of occurrence of rainfall are most important in the prediction...

Urban Hydrology for Small Watersheds (Revised 1985)
Urban Hydrology for Small Watersheds, Technical Release 55, was first issued by the Soil Conservation Service in January 1975. It is a guide for SCS field personnel for estimating hydraulic...

 

 

 

 

Return to search