Terminal Development as Affected by New Generation Ships
Howland Hook Marine Terminal, New York, serves to illustrate how an existing terminal, built to the older standards, can be adapted to accommodate these larger ships that not only stretch...
Container Crane Transfer Methods
Four schemes are presented for transferring container cranes around a corner: 1) transfer of crane on curved rail, 2) recessed short-radius shuttle, 3) recessed turntable and, 4) at-grade...
Innovative Bulkhead Design: Third Port Project?St. Croix, U.S. Virgin Islands
This paper describes an innovative design making use of a 'master pile' bulkhead to support the waterside rail for travelling container cranes as well as to retain...
Container Wharves Supported on All Vertical Piles Embedded in Rock-Fill Dikes
In recent years, several container wharves have been planned and/or constructed which feature the construction of the wharf over a sloping rock-fill dike. The wharves utilize all vertical...
Water Use Planning�Boston Harbor
This paper establishes a methodology for harbor planning based on comprehensively evaluating the water resource, categorizing the vessels which use the harbor, and prioritizing locational...
Geotechnical Aspects of Waterfront Parks: Case Histories
This paper presents several case histories of waterfront developments, and describes the general approach that the geotechnical consultant should take in the design of these projects....
Waterfront Parks in the Boston Area
Two recently completed waterfront parks in Cambridge and East Boston, Massachusetts are discussed. The Bird Island Flats 'Harbor Walk' project is a 15-foot wide,...
Recent Trends and Advances in Bulk Cargo Unloading
The progress in loading of bulk cargo into ships has matched the advances in ships' size. The same could not be said for getting bulk material out of the hold of a ship, in...
Design and Construction of Marine Facilities for Ridley Island Coal Terminal
The design and construction of the wharf for 250,000 DWT bulk carriers is discussed in this paper. The terminal project was carried out on fast-track, 23 month schedule, with construction...
Improving Maintenance Performance
This discussion concerns Maintenance Management concepts that emphasize how the human element among Port personnel can be organized and efforts channeled so as to: increase the actual...
A Multi-User Fender Design and Installation
The increase in damage frequency to the existing Timber Fender System during the change-over from military to commercial/industrial users resulted in a call for design solutions from the...
Lessons Learned from the Certification of Graving Docks, Marine Railways, Vertical Lifts and Shipbuilding Ways
Because of the hazards which exist during the ship docking, undocking, launching and while the ship is being built or repaired, the Navy has determined a requirement exists for system...
Report of Task Committee on Drydock Design Criteria
This paper briefly summarizes the work carried out by a Task Committee on Drydock Design Criteria which was established by the Committee on Ports and Harbors. The Committee was established...
Louisiana Avenue Wharf E: Rehabilitate the Existing Wharf into a Container Terminal
The Port of New Orleans is currently modernizing the existing facilities in order to handle the containerized cargos, therefore enabling it to compete with other ports located on the Gulf...
Rehabilitation of Gravity Wharf by Underpinning
The Municipal Wharf at the Port of Providence, Rhode Island, is currently under rehabilitation to accommodate modern trends in marine cargo handling and shipping. The three-phased project...
National Port Issues
The adequacy of U. S. ports to meet the Nation's present and future needs was evaluated by a Committee of the Marine Board, National Research Council. The changing character...
Underwater Compaction of Sand Fill During Placement
A system and related equipment have been developed, and tested on a recent dredged fill project, to compact sand, either clean or with limited silt, in lifts several feet in thickness...
Local Government Infrastructure Management
The collection of papers presents real world experiences and practical suggestions for improving infrastructure management in local governments. A case study is presented on how a computer-based...
Construction Materials for Civil Engineering Projects
The materials of construction in use today have grown in number, increased in complexity, expanded in application and multiplied in utilization over those in use just a short time ago....
Lifeline Seismic Risk Analysis?Case Studies
These papers employ design concepts and procedures in lifeline seismic risk analysis. Two of the papers describe the seismic hazards in the northwestern United States. A systems model...
Return to search