A Recommended Federal Action Plan for Reducing Earthquake Hazards of Existing Buildings
In September 1985 a Five-Year Plan for reducing earthquake hazards of existing buildings was submitted to the Federal Emergency Management Agency. This plan, prepared by the Applied Technology...

Reshaping Providence
By moving railroad tracks, river banks and several roadways, Providence, Rhode Island is reclaiming some 45 acres in its downtown and capital districts. This public works package is the...

Disney Engineers Voyage to the Deep
The main show at the Living Seas Pavilion, part of Walt Disney Production's EPCOT Center, Lake Buena Vista, Fla., is a visit to a tropical coral reef deep under the ocean....

Alternative Dispute Resolution
Usually it takes far less money and time to resolve a construction dispute if a lawsuit and court trial can be avoided. In the mini-trial, te two or more parties agree to radically reduce...

Ports in Transition in the Developing World
Export led strategies have been proposed by the main financial institution as a way for these countries to emerge from the downturn. This policy relies heavily on foreign trade. Transportation,...

Construction Approaches to the Navy's Floating Pier Concept
The subject of this paper is a floating pier which is currently under evaluation as a more cost-effective solution for berthing Navy ships. This new approach to pier design was sponsored...

Master Plan for Rehabilitation, Modernization and Expansion of the Port of Suez
Rehabilitation and expansion of the Port of Suez, started in 1977, has been an ongoing process for the last eight years and is continuing. As a result of detailed planning of facility...

Gabon Mineral Port Master Plan?A Case History
The integrated design of infra-structure and superstructure of marine terminals for bulk cargoes presents opportunities for innovative solutions that can produce substantial economic benefits....

Financial Analysis of Port Facilities
This paper describes a spreadsheet-based structure for financial analysis of port facilities and services, designed for use as a planning tool by non-specialist port managers. The paper...

Port Master Plans and Feasibility Studies
Port projects are cost-intensive long-life irreversible assets, and developing countries particularly limping with resource constraints could not afford the luxury of short-sighted defective...

Port Planning after Earthquake Damage
The earthquake of March 1985 affected two important ports in Chile: Valparaiso and San Antonio. While emergency measures succeeded in solving immediate operational problems, there remain...

The Application of Computer Simulation in the Design of Marine Terminals and the Scheduling of Ship Traffic
This paper describes a software package which simulates the operations of marine terminals. The computer programs were designed to assess the effectiveness of the available design alternatives...

Tacoma Sea-Land Terminal: A Project Management Challenge
The Port of Tacoma completed a new two berth container terminal and intermodal yard for Sea-Land in May 1985 in only 26 months after signing a binding agreement. The project, which also...

Terminal 18 Entry Facility?Port of Seattle
This paper presents a successful approach that was used in the planning, design, permit coordination, and expansion of the entry/exit facilities at Terminals 18 and 20 at the Port of Seattle....

Conversion of Keppel Wharves Conventional Berths 42 & 43 to Container Berths C13 and C14, Singapore
With further growth of container traffic expected in the 80's the need for additional facilities was apparent. Following an evaluation of available alternative sites, it was...

Carnation Terminal, Oakland?Preliminary Design
The Preliminary Design process is examined as it was applied to design of wharves for a new container terminal in the Port of Oakland, California. The process includes active interdisciplinary...

Siltation of the Port of Astoria
Sedimentation rates suddenly increased in the Port of Astoria, Oregon, immediately following the May 18, 1980 ash eruption of Mt. St. Helens. This ash was transported down the Columbia...

The Pacific Texas Pipeline Project?Deepwater Oil Terminal, Port of Los Angeles
This paper describes the implementation program and status of the Pacific Texas Pipeline Company project in the Port of Los Angeles. A brief description of this important 1. 6 billion,...

Fourth Generation Container Crane Characteristics
The specification of container crane characteristics requires the examination and identification of numerous ship and terminal operating parameters and trends to ensure that the specified...

Trends in Containerships and Their Impact on Terminal Design
A revolution in ocean shipping operations, affecting both landside equipment and cargo handling methods, is underway. In today's container shipping industry, maximum efficiency...

 

 

 

 

Return to search