Effects of Dredging and Dredge Spoil Disposal on Fisheries Resources in the New York State Barge Canal
The New York State Department of Transportation initiated a study in the summer of 1982 in the New York State Barge (Erie) Canal in the vicinity of Rochester, N. Y. The purpose of the...

Selecting a Dredge Pump
While it is not necessary for the dredge operator to know how to design a dredge pump, the ability to select one that meets his project requirements is essential to insure the success...

A Comparison of Seven Lake Dredging Projects
Over the past decade, dredging has been increasingly recognized as one method for restoring some of the country's numerous eutrophic lakes. While certainly not appropriate...

Cooperative Maintenance Dredging: a Strategy for Small Harbors
In a response to the continuing overall significance of harbor activities and the recognition of less than optimal existing harbor maintenance procedures, the feasibility of a cooperative...

Improved Techniques for Removal of Sediments Contaminated with Hazardous Materials
Realizing the need to improve the capabilities of response personnel in dealing with cleanup operations involving contaminated sediments, the U. S. Coast Guard and the U. S. Environmental...

After Industry Capability Program
This paper presents information on the dredging work split between the government and industry since the end of the Industry Capability Program (ICP) in Fiscal Year 1981. A long-term look...

The Corps' Environmental Effects of Dredging Programs
The major programs addressing environmental effects of dredging and disposal that have been or are being conducted by the Corps since 1973 are: Dredged Material Research Program, Dredging...

Practicality of Advance Maintenance: Savannah Harbor
Advance maintenance of navigation channels can involve deepening, widening, side slope dredging, or a combination of these. Because advance maintenance in Savannah Harbor has only involved...

Dredging-Related Considerations in Navigation Channel Design
In the design of a navigation project, the channel depth, width, and alignment for a given set of navigation requirements are dependent on physical, hydrodynamic, and sedimentological...

PCB Contaminated Sediments from Petit-de-Grat, Canada
In Canada, ocean disposal of dredged materials is regulated by the Ocean Dumping Control Act. Included within the schedules of regulated substances are organochlorine compounds, such as...

Alternative Upland Disposal Techniques for Dredged Material in Urban Areas
The project involves the dredging and disposal of 750,000 cubic yards of soft organic silts from a 32 mile long manmade Canal that tranverses through Central New Jersey and is known as...

Dispersal of Wastewater in the Ocean--A Cascade of Processes at Increasing Scales
An engineering system for marine waste disposal is described. Design decisions are based on broad categories of input information: the complete description of the waste to be discharged;...

Cost-Effective Water Quality Management and Risks
Environmental regulations typically specify applicable streamflow conditions for compliance with water quality standards. The level of streamflow specified is one of the most significant...

Risk Analysis in Water Quality Control
Design of facilities for the control of water quality is usually predicated upon some explicit expectation of performance. In reality, unit operation efficiency, system operation, model...

Hydraulic Uncertainty in Risk Analysis
Considerable effort has been expended in defining and evaluating hydrologic uncertainties; however, the analysis and evaluation of hydraulic uncertainties has received little attention....

Risk Analysis in Dam Safety Programs
There are about 68,000 dams in the Nation. About 95 percent of the dams are nonfederal; the balance are owned by various agencies of the federal government. Over 30 percent of the high...

Sedimentation Study for the Rochester, Minnesota, Flood-Control Project
In a cooperative effort, the U. S. Army Engineer District, St. Paul (NCS), and the Soil Conservation Service (SCS) planned a combined flood-control project. The SCS portion of the project...

Analysis of Partially Filled Circular Storm Sewers
The classic design approach uses Manning's formula. Comparisons between analytical results obtained in this manner and the many available experimental results indicate substantial...

The Design and Construction of the Bartletts Ferry Labyrinth Weir Spillway
The discharge capacity of the Bartletts Ferry Project has been increased 165 percent by the addition of a labyrinth weir spillway. The hydraulic design was based on a published design...

Hydrotest Rupture of Penstuck Liner at Bath County
Bath County is the construction site of Virginia Electric and Power Company's pumped storage project. Rupture of a penstock liner during hydrotest at high pressure threatened...

 

 

 

 