Accuracy Standards and Development of a National Shoreline Change Data Base
Data associated with mapping shoreline position provides baseline information used by scientists, managers, and planners for quantitative assessment of historical trends and prediction...
Beach Profile Response to Hurricane Hugo
The impact of hurricane Hugo on the beaches of South Carolina is examined by comparing beach survey data collected during the spring and summer of 1989 with post-storm survey data collected...
Dredge Spoil and Inner Shelf Investigations off Tauranga Harbour, Bay of Plenty, New Zealand
Dispersion of dredge spoil from an inner shelf dump-mound in 11-17 m water depth, 3 km offshore from Tauranga Harbour, Bay of Plenty, New Zealand, was investigated as part of environmental...
Performance of a Beach Nourishment Project Based on Detailed Multi-Year Monitoring: Redington Beach, FL
A recent monitoring project of a beach nourishment project includes closely spaced profiles and sediment analysis which provides data on nourishment performance which can be used in management...
Complex Principal Component Analysis of Wave-Like Sand Motions
Complex Principal Component Analysis is applied to bathymetric data from the SUPERDUCK experiment at Duck, NC. This approach is shown to describe more of the variation with fewer functions...
An Evaluation of Area Source Dispersion Algorithms
The correct simulation of air pollutant dispersion from area sources of pollutants has presented some unique challenges to dispersion modelers. This study employs geometric tests and sensitivity...
Biological Methods for Air Decontamination: Modeling Hydrocarbon Removal
Bench-scale tests indicate biofilter treatment of gasoline and diesel with activated carbon support media is first order, while removal of ethanol on compost is zero order. Treatment of...
The Ozone Layer: A Critical Analysis of the Management of Public Policy for Fluorocarbons
As environmental public policy becomes increasingly extensive it continues to have greater impact on the lives of each American. The management of the public policy formation process varies...
Evaluating Hydro Relicensing Alternatives?Impacts on Power and Non-Power Values
The relicensing of 300 hydroelectric plants in the next decade involves a total capacity of about 4,000 MW - a $10 billion value. A methodology recently developed by Decision Focus Incorporated...
Hydraulic Model Studies for Non-Federal Projects at Federal Dams?A Case Study
This paper will discuss the hydraulic model studies for hydropower projects developed by Arkansas Electric Cooperative Corporation (a non-federal entity) at existing Corps of Engineers...
Screening Data with an Expert System (PDAS)
The performance of a three-mile long penstock, constructed in an active landslide area in northern California, is monitored using 138 vibrating wire-strain gauges. Readings are taken daily,...
Decision Rules for Reservoir Releases
One of the problems faced with computer modeling of a multi-reservoir, hydro-power system is making decisions on how releases will be made. Reservoirs many times have multiple demands...
The Wisconsin River System Operations Model: WIRSOM
The passage of the Electric Consumers Protection Act of 1986 requires the Federal Energy Regulatory Commission to give equal consideration to non-power as well as power values in hydroelectric...
A Flow Forecasting System for Hydro Power
The flow forecasting system comprises a network of meteorological stations, a weather forecasting model, and a watershed hydrologic model, implemented in a microcomputer. The meteorological...
Hand Held Powerhouse Control Console or Portable Data Terminal
The Portable Data Terminal (PDT) is a very small light weight hand held computer terminal that communicates with the control system computer by radio. An operator monitors power plant...
Dam Safety Hydrologic and Seismic Evaluation of TVA'S Beech Dam
Beech Dam is part of the Beech River watershed resource development located in Decatur and Henderson counties in west Tennessee. The development consists of eight dams and approximately...
Rocky Mountain Project?Probable Maximum Floods
Probable maximum floods (PMF's) were estimated for use in designing spillways for the lower reservoir main dam and two auxiliary pool dams at the Rocky Mountain pumped-storage...
Validation Studies on Indexed Sequential Modeling for the Colorado River Basin
A method called indexed sequential modeling (ISM) has been developed by the Western Area Power Administration to estimate reliable levels of project dependable power capacity (PDC) and...
Operation of Hydropower Plants Considering Daily Streamflows
Operation of hydropower plants is a sequential decision process often modeled as a dynamic programming problem. Typically, such formulations consider monthly stages assuming that monthly...
Streamflow Gaging in a Remote Area Using Cellular Telephone Telemetry
A case study will be presented describing the utilization of cellular phone technology in a remote sensing situation. Because expected annual energy estimates are vital in planning small...