Structural Expression in Tall and Super Tall Buildings
The economic and social pressures that have pushed skyscrapers higher above our cities have also brought forth new structural systems for tall buildings. As this trend is expected to continue...

Assessing Seepage at Uncontrolled Hazardous Waste Sites
This paper presents a conceptual framework for estimating the concentration of organic contaminants in a groundwater plume over time. The basis of this framework is the application of...

Vehicle Sound Power measurement Using the Acoustic Intensity Method
The use of the two microphone Acoustic Intensity Method of obtaining accurate measurement of over-all sound power of large wheel loaders is described. This system is in operation, within...

Noise Assessment, Measurement, and Mitigation, an OSHA View
A discussion is presented on the Occupational Safety and Health Administration (OSHA) 29 CFR 1910. 95 General Industry noise exposure standards and the 29 CFR 1926. 52 and 1926. 101 Construction...

High Strength Steel
A Wall Street Journal story in January 1984 described a number of bridges, buildings, automobiles, buses and other structures made of high-strength...

Monitoring Saves a Site
A comparison is made of two supported excavations that were similarly designed and constructed. Both excavation support systems consisted of a soldier pile and lagging sheeting wall supported...

Characterization of Indoor Carbon Monoxide Levels Produced by the Automobile
Integrated air samples were obtained at seven small and six large service stations and two dealerships. These establishments were sampled during cold and warm weather operations for eight...

Apportionment of Costs for Multi-Party Cleanups
A rational model was developed for allocating remedial response costs among potentially responsible parties involved in clean up of abandoned waste sites. The model takes into consideration...

Emerging Environmental Clean-Up Responsibility
This paper is a summary of the structure of regulations requiring clean-up of sites when closed or sold, specifically the State of New Jersey's Environmental Cleanup Responsibility...

Field Scale Solidification/Stabilization of Hazardous Wastes
The selection of appropriate remedial action measures only takes place after a full evaluation of all feasible alternatives. An alternative to off site disposal is solidification/stabilization...

Hazard Assessment of Landfill Fire Air Emissions
The PJP Landfill, located in northeastern New Jersey, is a suspected hazardous waste site, and is listed on the federal Superfund National Priorities List. In addition to contaminating...

RCRA Compliance During Remediation of Waste Sites
The author discusses the impact of the proposed National Contingency Plan revisions of February 1985, which require that remedies under Superfund must attain or exceed applicable or relevant...

Adsorption and Release of Heavy Metals in Contaminated Soil
This study investigated the adsorption and release rates of toxic metals in soil type associated with hazardous waste sites common to the Northeastern United States. Five heavy metals...

The Engineering Aesthetics of Tall Buildings
The Proceedings of a session on the Aesthetics and Design of High-Rise Buildings at the ASCE Convention in Denver is included in its entirety. The session was chaired by Lynn Beedle and...

The Role of Nonprofits in Coastal Conservation
The California State Coastal Conservancy's Nonprofit Organization Assistance Program is a unique vehicle through which private land trusts and other nonprofits have become...

Radioactivity in the Ocean: Laws and Biological Effects
This paper summarizes the literature on U. S. laws and international agreements, experimental and monitoring data, and ongoing studies to provide background information for environmental...

Effects of Perturbations on South Padre Island
The types, extents, and durations of perturbations affecting the ecological zones of South Padre Island are assessed. Emphasis is placed on providing the environmental documentation necessary...

Tapping Deep Water Resources
Lena is the first commercial guyed tower. Its jacket is the longest ever fabricated, loaded out and launched in one piece. Lena stands in 1,000 ft deep water and has a three-level oil...

Successful Use of Trench Box in Sewer Line Construction
Faced with the problems of ever increasing construction costs, more and more methods are being employed in an attempt to keep expenses to a minimum without sacrificing the quality of construction...

Stress and Strain Responses of a Soil-Pipe System to Vehicular Traffic
A 16-in. natural gas pipeline near Racine, Wisconsin, had been in service for some 30 years. In 1982 road widening operations on a line parallel with the pipe presented the opportunity...

 

 

 

 

Return to search