Renovation Versus New Construction for High Technology Manufacturing Facilities
The purpose of this paper is to compare the differences between renovation and new construction for High Technology Manufacturing Facilities. The standards of quality, cost, and schedule...

Endangerment Assessment in a Multilayered Aquifer Using a Microcomputer Based Transport Model
An endangerment assessment describes the types and degrees of potential hazards to public health, welfare, or the environment that may result from the release of hazardous substances into...

Facility Location and Land Use: The Urban/Rural Dilemma?A Commentary
A large part of the dilemma associated with the conflicting impacts of facility location and land use is not so much a lack of technical engineering input, but rather the lack of analytical...

Designing People Places
Designing people places on the waterfront relies on first satisfying people's needs. The needs of people in public places (both on and off the waterfront) include at least...

The Changing Configuration of Commercial Ports
The ports of the world are constantly changing. The present day concept of a ship or barge entering a harbor, being unloaded, reloaded and 'sailing' out is not...

Practice of Risk Analysis in the Private Sector
Although risk-analysis is currently gaining acceptance in the decision process among engineers involved in public safety of water resources projects, the 'state-of-the-art'...

Complexity in Concrete
Centrust Tower in Miami, Fla., is a $95 million, 37 story, 600,000 sq ft tower rising from one side of a block-square 11 story parking garage. Columns on the curved side of the triangular...

Facility Location and Land Use
The Urban/Rural Dilemma
Most land use planning techniques focus on large metropolitan areas, with relatively little attention paid to smaller communities. Recent issues such as nuclear power plant location, water...

Parking Efficiency Through Shared Parking Concepts
Due to continuing demand for concentrated parking supply in our urban areas, developers and public agencies must devote a significant amount of their resources and energies to providing...

Defining the Infrastructure Problem?The Local View
The Governor's report defines infrastructure as 'the collective network of physical facilities and their maintenance necessary to sustain economic growth and...

Infrastructure: Rehabilitation or New
Basically, each public entity needs to inventory its infrastructure system and evaluate its importance to the immediate requirements of public health, safety and welfare. Prioritize the...

Deep Water Bering Sea Development Concepts
A brief description of the major environmental factors that a structure used to produce oil and gas in the deep water Bering Sea would have to cope with is presented. In particular, the...

Ice Forces on Port Structures Resulting from Moving Ships
Results are described of experiments carried out in Thunder Bay Harbour in March, 1984, to measure ice forces on a port structure. Ice forces were measured by installing five pressure...

Structural Considerations for a Radwaste Facility
The structural engineer needs to consider several criteria when designing a radioactive-waste processing facility in order to properly balance the requirements of safety and economy. This...

Nuclear Power Plant Delays: Probable Causes and Resolutions
The nuclear power industry in the United States is experiencing technological as well as construction and operation problems in nuclear facilities. It is the intent of this paper to review...

A Model for Nuclear Waste Shipping and Storage
A management option for spent fuel assemblies from nuclear power plants is storage in away-from-reactor (AFR) storage facilities. The purpose of this paper is to preseent a new mathematical...

Oconee Spent Fuel Rerack
Spent fuel storage problems facing electric utilities with nuclear generation are growing more critical as existing spent fuel storage capacity is utilized. Due to the inaccessibility...

Mixed Use, Mixed Materials
Tabor Center is a $330 million office/commercial/hotel complex in Denver's urban renewal area. The two block site is bisected by a street that had to be kept open during construction....

MBTA Red Line Extension Operating Plan
Completion of the MBTA's 3. 2 mile Red Line Rapid Transit Extension is scheduled for 1985. When completed, the seven year 574 million project will add three new stations to...

Electric Utility Noise Emissions
Environmental regulations require that impact statements for new electric utility and industrial power plants include an evaluation of noise emissions. Variations in equipment sound power...

 

 

 

 