Environmental Mitigation Techniques for Marina Development
The paper discusses a coastal design process entitled 'Design by Mitigation'. It describes a series of mitigation measures and techniques which can be used to...

Wetland Restoration and Port Development: The Batiquitos Lagoon Case
Batiquitos Lagoon in San Diego County, California was once a fully tidal lagoon system. Since American settlement of the area, sediment has filled the lagoon, fills for road crossings...

Mitigation Features for Marinas
The John Wayne Marina was permitted for construction only after certain design features were altered to accommodate major biological and water quality concerns. The moorage basin was relocated...

North Fraser Harbour Environmental Management Plan
In April 1985, the North Fraser Harbour Commission (NFHC) initiated work to establish an environmental management program for the North Fraser Harbour to be jointly administered by the...

Port Facility Development: Public Access and Mitigation Requirements
Coordination of compatible uses and resolution of use conflicts requires continuous effort, extending beyond the planning and permit process and requiring long-range committment of staff...

Economical Solutions for Dredged Material Disposal
During the 1970's, the State of Wisconsin expressed concern about contamination of dredged materials and the deposition of pollutants into Wisconsin's Great Lakes...

Judicial Solutions to Beach Access Problems in New Jersey
Legal doctrines notwithstanding, access to public trust beach is still, in many locations, inconvenient, expensive, or impossible. Private property signs containing threats of fines or...

Resident Only Moorings: A Sign of the Times Or an Endangered Species?
As the demand for mooring space has increased in various coastal harbors throughout New England, many New England coastal communities have enacted legislation giving either explicit or...

Liberty State Park: A Public/Private Partnership (abstract)
The Liberty State Park Development Corporation was formed to create public/private partnerships to develop this 750 acre urban park, which lies just 1750 feet from the Statue of Liberty....

Influence on the Extension of Ondarroa Harbor on Adjacent Beaches
The present article deals with the analysis of the influence of the different Ondarroa Harbour extensions on the adjacent beaches by using a semi-movable model test. These model tests...

Athens Siphon and Outfall
More than 130 million gallons of untreated domestic and industrial wastewater are discharged each day into the sea near Athens. To mitigate this situation, the government of Greece is...

Shallow Ocean Disposal of Contaminated Dredge Material
The contaminated dredged materials from harbors and waterways along heavily populated coastal areas such as Connecticut must often be disposed at shallow ocean sites. To isolate the contaminants...

Little Bubbles, Big Payoff
Fine poor diffusers often boost the energy-efficiency of aeration in sewage plants by 25-50%. This is important because the combined energy bill of all U.S. municipal sewage plants is...

Parking Lot Drainage Design: Gainesville, Florida
The construction of a 10-acre (4. 05 ha) parking facility (1,000-car capacity) at the University of Florida during 1984 presented the potential for increasing downstream flooding and for...

Numerical Model Evaluation of Advance Maintenance
Improving and maintaining navigation harbors and channels is one of the key functions of the US Army Corps of Engineers. The present cost-sharing system and the increasing costs associated...

Mathematical Simulation of Halocarbon Distributions in Boston Harbor
In an effort to better understand the sources and transport of effluents, a combined modeling and field measurement program has been initiated. The modeling uses a pair of 2-D (depth-averaged)...

Sedimentation of Summit North Marina Connected to C&D Canal
Possible sedimentation problems at the proposed site of the Summit North Marina were investigated and reported. This brief paper summarizes the detailed results given in the report. The...

Reliability Analysis of Pumping Stations and Storage Facilities
The methodology presented for pumping stations is based upon three models: a supply model, a demand model, and a margin model. The supply model considers so-called states of a system which...

Capacity Expansion of Water Distribution Systems?A Case Study
Capacity expansion and necessary capital improvements to meet the water supply demand for years 1990-2020 for the U. S. Route 1 corridor development from South Brunswick to Princeton,...

Liberty Restored
The Outstanding Civil Engineering Achievement of 1987 is the restoration of the Statue of Liberty in New York Harbor. The restoration work included many engineering tasks that by themselves...

 

 

 

 

Return to search