Constraint Management on Distributed AEC Configurations
Architecture, Engineering and Construction (AEC) design processes involve the participation of many designers who may be working independently in geographically distinct locations. We...

Integrating Pen Computers with Other Keyless Data Systems for Construction Applications
This paper describes the various construction applications in which the combination of pen computers and keyless data entry systems could be utilized for the purpose of greatly increasing...

Computer-Assisted Instruction in Civil Engineering
Computer-assisted instruction (CAI) software offers several advantages over traditional classroom instruction which makes it a useful addition to any curriculum, and the area is rapidly...

Simulating Learning Development for Construction
This paper presents the methodology used to model the learning development phenomenon in the CYCLONE format using the Boeing learning curve. CYCLONE is a discrete event process interaction...

BRICAL: A Multimedia Intelligent Educational System for Bridge Engineering
This paper discusses the development of a multimedia intelligent educational prototype system for bridge engineering called BRICAL. BRICAL uses information networks to express the relationships...

Software Interface in Engineering Applications
The evolution of personal computer (PC) software has reached the point where most major types of software will interact. The ability of PC programs to share various texts, graphics and...

What Do Project Managers (need to) Know About CADD?
Computer Aided Design and Drafting (CADD) is here to stay. Today's project managers are being challenged to master the use of CADD on their projects. CADD often can 'make or break' a project....

An Overview of the Analysis and Design Techniques Used on the Main Tunnels of the SSC
Sophisticated numerical analysis and design techniques were devised for the Supercollider in order to produce a design which closely reflected the constraints of the construction processes,...

Database Integration in Support of Construction Management
This presentation will describe how new object-oriented technology is being applied to this problem. The goal of this use of object-oriented systems is 1) to provide a method for processing...

Facilitate Delay Claim Analysis with As-Built Schedule Databases
A computer-based As-Built Schedule Database can provide a useful tool for the investigation of project performance. The facts recorded in the database may be used to identify actual sequential...

Contemporaneous Development of Field Data: Transportation Construction Claim Defense
This paper addresses the continuing development of a construction field database system documenting resources applied on the jobsite by Contractors. The paper focuses on the case study...

Computer Use in Claims Analysis -- Roundtable Discussion
Preparation or defense of construction claims is inherently time consuming and often counter-productive. This outline discusses some tools currently used in the construction industry to...

CadVisor (CAD Equipment Analysis and Selection System)
This paper describes a system called CadVisor (CAD Equipment Analysis and Selection System) developed by the U.S. Army Corps of Engineers Construction Engineering Research Laboratories...

Practical Approach to Cope with Construction Cost Uncertainty in an Inflationary Environment
There are actions suggested to mitigate the risk in costs caused by an inflationary economy, such as escalation clauses and including price contingencies in the bid . This paper presents...

Management Information System Application on a Multi-Million Overseas Project
Project Management Information Systems (PMIS) provides improved data quality, consistency, timeliness, and reporting flexibility and improved project teamwork. Project managers have a...

Methods to Reduce the Settlement of Embankments on Soft Clay: A Review
New trends have been observed during the past ten years in the practice of settlement control for embankments on soft clays: they include increased use of rigid (piles) or semi-rigid (stone...

Displacement of Landmark Building Resulting from Adjacent Construction Activities
This paper describes the observations and presents comments related to the measurement of settlement and the avoidance of damage to a historic structure in the City of New York from adjacent...

Performance of Nanhua Dam During Construction
The pore pressure response and settlement during the construction of Nanhua dam were studied by several methods, including Hilf's method, laboratory stress path simulation and numerical...

Dynamic Compaction of Landfill Beneath Embankment
This paper presents the results of a highway project where dynamic compaction was used to densify a closed landfill prior to constructing highway embankments over the landfill. The purpose...

Finite Strain Consolidation for Vertical Drains
Consolidation equations for vertical prefabricated drains which consider finite vertical strain of the soil are derived. Estimated consolidation times are shorter when finite soil strain...

 

 

 

 

Return to search