Systems for Reducing Sedimentation in Berthing Facilities
Five systems are described which can be used to reduce sedimentation in harbor berthing areas. These systems, which are alternatives to conventional dredging, are based on either the resuspension...

Computer Models for Dredged Material Disposal Planning
Short term and long term planning for the disposal of dredged material can be significantly enhanced using state-of-the-art computer modeling. Computerized mathematical models can be constructed...

Shoaling Problems and Improvements Sunny Point, North Carolina
The Military Ocean Terminal, Sunny Point (MOTSU), is located on the Cape Fear River, approximately 18 miles downriver from Wilmington, North Carolina. The facility has experienced significant...

The National Dredging Data Management System
The ADDAMS computer program is a collection of user-friendly computer models for planning, designing and managing confined disposal areas. Models which can be used to determine the size...

Dredge Automation: The State-of-the-Art
Automated control systems are being developed and applied to enhance the productivity and cost-effectiveness of dredges. Referring particularly to hydraulic type dredging plants, the functions...

Linear Programs for Dredging Management Decisions
Recurrent economic concerns facing decision makers in the dredging industry are considered. Problems related to contract bidding, project planning and resource utilization are formulated...

Soil Analysis and Dredging
Analysis of soils before dredging can make or break a dredging project. It is seldom possible to obtain all of the information needed for selecting equipment and estimate outputs. The...

An Application of Acoustic Core Analysis
This technique has shown itself to be extremely successful at Roberts Bank, in a highly variable bottom material, where shallow depths were not a significant problem, and some borehole...

Dispersal of Wastewater in the Ocean--A Cascade of Processes at Increasing Scales
An engineering system for marine waste disposal is described. Design decisions are based on broad categories of input information: the complete description of the waste to be discharged;...

Development of Response Plans for Toxic Spills
A plan is proposed for managing the response to a toxic spill into a river system and the minimization of its effects on water utilities, industry and the environment. As technical aids...

Risk Analysis in Water Quality Control
Design of facilities for the control of water quality is usually predicated upon some explicit expectation of performance. In reality, unit operation efficiency, system operation, model...

Hydraulic Uncertainty in Risk Analysis
Considerable effort has been expended in defining and evaluating hydrologic uncertainties; however, the analysis and evaluation of hydraulic uncertainties has received little attention....

Scour and Fill Monitoring at Lock and Dam No. 26 (Replacement), Mississippi River
Information gathered during construction of the first stage dam is presented. The information consists of data indicating flows and stages along with data obtained from surveys which monitor...

Overtopping of Flood Control Levees and Floodwalls
The risk of overtopping can be significant for flood control levees or floodwalls, and the consequences can be costly and potentially catastrophic. Designs using superiority can force...

Analysis of Partially Filled Circular Storm Sewers
The classic design approach uses Manning's formula. Comparisons between analytical results obtained in this manner and the many available experimental results indicate substantial...

Accurate Computation of Nonlinear Advection
Advection, the transport of a quantity by the mean velocity, is a process which appears in virtually all equations of free-surface hydraulics. The demonstrated accuracy and efficiency...

Stability of Method of Characteristics
For the analysis of waterhammer, the first-order accurate method of characteristics (MOC) has been widely used for which Courant condition for stability has been developed neglecting the...

Hydrotest Rupture of Penstuck Liner at Bath County
Bath County is the construction site of Virginia Electric and Power Company's pumped storage project. Rupture of a penstock liner during hydrotest at high pressure threatened...

Intake-Shoaling and Pump-Vibration Problems
Iowa Generation's Council Bluffs Unit 3 circulating water-intake structure has experienced two major problems: (1) formation of sand bars in front of the trash racks during...

A Three Dimensional Hydraulic Jump
A study is conducted to define the three-dimensional hydraulic jump that occurs in a rectangular channel downstream of a rectangular contracted sluice gate. A sequent depth ratio equation...

 

 

 

 

Return to search