Flood Control
The Hamilton and Riemer reservoirs were constructed by excavating pits below grade to receive flood overflows from adjacent streams. The two reservoirs are part of a 52 sq. mile (135 km�)...

Treatment of Design and Construction Errors in PRA
The risk estimates developed in a PRA should allow for potential design and construction errors. These errors generally modify the component responses and fragilities. Since most design...

Enhancing Quality of Construction on Nuclear Facilities
From the author's viewpoint and the viewpoint of others, the quality of construction on both nuclear projects and many other non-nuclear projects has decreased. The trend...

Desin Control for Nuclear Power Plant Modifications
Modifications to operating nuclar power plants which impact structural components must be performed in a manner that is consistent with the licensing basis and technical specifications...

Microcomputer Applications for NSSS Data Package Review
Associated with each component of a Nuclear Steam Supply System are the necessary supporting documents which demonstrate compliance with applicable codes, specifications and design criteria....

Bayesian Procedure for Evaluation of Containment Capability
The functional requirements of a steel or concrete containment is to maintain the structural integrity as well as the leak-tight integrity of its pressure boundary under specified design...

Containment Capability
Section 2. 0 of this report contains a description of analysis methods for the containment structure. Testing on containment models and sections of containments is described. Section 3....

Update on Impact Effects in Nuclear Plants Part II?Review of Pipe Whip Impact
Current regulations require that pipe breaks be postulated in high-energy lines and measures be taken to prevent consequent damage to essential structures and systems. The paper addressed...

Weather Modification Potential ? Santa Clara Valley
Santa Clara County of California has been a water deficient area. The Santa Clara Valley Water District has an obligation to the community and to the other water users in the State to...

Assessing Results Weather Modification Programs
There is a continuing need to assess the effectiveness of operational precipitation augmentation weather modification programs. These assessments can serve a variety of needs including:...

Security of Unattended Pipeline Stations
The ultimate purpose of a security system is to maintain equipment and service in a normal operating condition or to restore the equipment and service to normal operating condition as...

San Joaquin Valley Hydrologic-Economic Model
The rapid development of agriculture in the San Joaquin Valley has resulted in increased ground water pumpage. Increasing energy costs coupled with increasing pumping lifts have a major...

Groundwater Basin Storage in Southern California
The feasibility of implementing a groundwater storage program in the Chino Groundwater Basin (Chino Basin) to increase the firm yield of the SWP (California State Water Project) is considered....

Probing the Past
In Denver, Colorado, 12 buildings of an old abandoned brewery complex were to be renovated into a 270,000 sq ft shopping, entertainment and restaurant complex. Rather than conduct a thorough...

Rehab: More Art than Science
A survey of structural/civil engineers revealed that low fees are the major problem in structural rehabilitation work. Other concerns are unforseen conditions, inadequate investigation,...

Easing Strains in Partner-Managed Firms
The family-like nature of partnerships promotes shared management responsibilities but creates conflict. Partnerships, like families, are often taken for granted by the partners. Nonpartners...

Environmental Engineering
The purpose of the Annual Conference on Environmental Engineering is to pursue scientific knowledge and promote sound engineering judgement and practice in the solution of the many environmental...

Water Today and Tomorrow
These conference proceedings include 87 papers dealing with irrigation-related topics concerning water supplies, water quality, legal and social infrastructure, irrigation projects and...

Harmonizing Organizational and Personal Needs
A system is presented for result-oriented allocation of time, energy and resources between the three important forces controlling any manager's life: himself, his family and...

Quantifying Organization Goals in Project Planning
In this paper we develop and demonstrate the application of a goal programming model. It is designed to assist top management to incorporate the goals of an organization in allocating...

 

 

 

 

Return to search