Detention Pond Outlet Design for Pollution Control
Stormwater runoff detention ponds were originally developed for the control of flooding and the designs of the outlet control structure must be modified to obtain pollution control objectives....
High Streamflow Behaviors in the Ohio River Basin
The intensity function, which describes the severity of the flood occurrences, is a critical factor in flood control and reservoir operation. It is found that the occurrence rates of high...
A Three Dimensional Hydraulic Jump
A study is conducted to define the three-dimensional hydraulic jump that occurs in a rectangular channel downstream of a rectangular contracted sluice gate. A sequent depth ratio equation...
Reservoir System Management for Water Quality
A reservoir system analysis computer model has been recently developed with the capability to simulate up to 10 reservoirs, 30 control points and 8 water quality parameters. With this...
Flood Travel Time
The effects of infiltration on the flood travel time are investigated. In flood prediction, the physical domain for flood cumulation is expressed by the period of time for water to travel...
Discharge Characteristics of Labyrinth Weirs
The hydraulic performance of labyrinth weirs is developed from data obtained from flume studies and site specific models. Using dimensional analysis, an equation for the discharge is developed...
Riprap Sizing-Four Methods
A comparison summary is provided for sizing of riprap by four methods: Isbash, Froude, Tractive Force - Logarithmic Velocity Profile (TFL), and Tractive Force - Power Velocity Profile...
Cavitation in Various Types of Shear Flow
Cavitation in turbulent shear flow depends on the intensity and spectral characteristics of the pressure fluctuations in a Lagrangian frame of reference as well as depending on the concentration...
Cavitation Inception from Cylindrical Holes
The inception of cavitation due to circular holes in a boundary is studied. Laboratory experiments were conducted to define limited cavitation as a function of the hole depth to diameter...
Movable-Bed Model Investigation of Littoral Drift on the Intake and Outlet of Lin-Kou Power Plant (I)
The establishment and operation of a distorted movable-bed model of the cooling water intake and outlet is described. The model employed is a three-dimensional movable-bed Froude model...
Physical Hydraulic Modeling for a Small Hydroelectric Redevelopment
In the development of a small hydroelectric project, the operating head on the plant is usually limited. On these projects, the need to minimize head losses and eliminating other factors...
Experimental Study of Stratified Cooling Ponds
Experiments in a laboratory physical model were conducted to analyze the hydrothermal performance of vertically stratified cooling ponds. Temperature, velocity, and fluorescent dye measurements...
CN Approach to Water Budgets for Small Watersheds
In some states, issuance of a surface mining permit is dependent upon an assessment of the current hydrologic baseline of the area to be mined and of the probable future impacts of mining...
Simple Hydrologic Modeling
Several simple models for estimating precipitation and evapotranspiration from a limited data base are discussed. Rainfall probabilities may be calculated from mean monthly rainfall. Depth-duration-frequencies...
Hydraulics and Hydrology of Border Irrigation
Proper description of the hydraulics of irrigation of farmland is necessary in management. Many descriptions of furrow or border irrigation are not adequate to describe truly physically...
Realistic Hydrology for Basin Management
Several realistic yet simple methods to describe infiltration, soil moisture redistribution, aquifer recharge, canal seepage and stream-aquifer interaction in a river basin are presented...
Decreases in Runoff and Sediment Yield by Drainage
Runoff and sediment yield from three small agricultural watersheds were measured during four winter rainfall seasons. Following two rainfall seasons of data collection, a subsurface drainage...
Modeling Analysis for Management of Artificial Recharge
The objective of these groundwater and sediment modeling studies is to determine the net change in storage and potentiometric levels within the Bunker Hill Groundwater Basin resulting...
Decision Making in Establishing Instream Flow Needs in Minnesota
Allocation of water for instream use depends upon how well the need and justification for instream flows can be communicated to decision makers. The analysis and presentation of instream...
Assessing Irrigation Impact on Instream Flow
A hydrologic model to help river system managers determines the demand for irrigation water in a two mile wide strip of land along the river using information which is generally available...
Return to search