The Stabilization of Minidoka Powerplant and Dam
The rehabilitation of structures can pose numerous challenges to the engineer. The structure historical preservation, the benefit cost ratio of the rehabilitation, and the stability of...
Seismic Analysis of the Bonneville 1st Powerhouse
The Bonneville 1st powerhouse monoliths were constructed during the period of 1938 to 1942 and were designed against seismic loads using the old lateral coefficient method. The Corps of...
Dam Stabilization/Modification at Lighthouse Hill and Schuylerville Hydropower Developments
Remedial measures including posttensioning of concrete structures, earth dike armoring, tainter gate modification and replacement of deteriorated concrete to meet federal and state hydraulic...
Dam Safety Rehabilitation of the T.V.A. Nickajack Hydroelectric Project
Safety of its dams has always been of great concern to the Tennessee Valley Authority (TVA). The agency has throughout its history enforced conservative designs, good construction practices,...
Junction Falls Dam Rehabilitation?New Design Incorporates Vintage Concept
Junction Falls Dam was constructed in a gorge of the Kinnickinnic River in 1920 to produce hydroelectric power for the city of River Falls, Wisconsin. In 1988, the River Falls Municipal...
Brule Hydroelectric Project Inflow Design Flood Study
In 1987, Wisconsin Electric Power Company (WE) was directed by FERC to provide additional spillway capacity at it's 63-foot (19 m) high Brule Dam. Original spillway capacity...
The Replacement of Penstocks at TVA Ocoee II Power Plant
The Tennessee Valley Authority (TVA) replaced the steel penstocks at its Ocoee II power plant near Ocoee, Tennessee. A total replacement was necessary because of severe corrosion on the...
Rehabilitation of the Dams at the Crescent and Vischer Ferry Hydroelectric Projects
This paper reviews the dam rehabilitation design and construction techniques used at the New York Power Authority's Crescent and Vischer Ferry Dams. The following are the...
Outlet Works Modifications at Abiquiu Dam
For the installation of a hydroelectric project at the Corps of Engineer's Abiquiu Dam in New Mexico, outlet works modifications that would not affect the structural integrity,...
Civil Design of the Sidney A. Murray Jr. Hydroelectric Station
This paper addresses the general civil design of the Sidney A Murry Jr Hydroelectric Station with special emphasis on the design requirements of the project's unconventional...
Unique Design Used for Collapsible Gate
The collapsible gate on the Wausau Dam is unique; there is only one known that is similar in design. The collapsible gate, which looks like an inverted V, was designed by Mead and Hunt...
Superplasticized Concrete for a Prefabricated Powerplant Structure
This paper describes the use of superplasticized concrete in extremely difficult placements inside a restricted access preassembled powerplant structure (PPS) of a 192 MW Sidney A Murray...
Rocky Mountain Project Conceptual Design of Upper Reservoir
The 9300 acre-foot upper reservoir for the Rocky Mountain Project will be formed by an 80-ft high ring dam with a crest length of 12,800 feet. Sandstone and shale of the Pottsville formation...
Evaluating History?The Edison Sault Powerhouse
The hydroelectric facility owned by the Edison Sault Electric Company at Sault Ste Marie, Michigan was an engineering marvel when it was designed and constructed. This paper explores the...
Design of Penstocks in Severe Earth Slide Locations
This paper deals with the problems of locating a penstock for a small hydroelectric plant at a site in Northern California that experiences considerable land movement during the rainy...
Penstock Rehabilitation
The deterioration of aging penstocks is a common problem at many existing hydroelectric plants. A comprehensive understanding of the physical condition and functional limitations of an...
The Development and Writing of the ASCE Manual of Practice for Steel Penstocks
The 'Manual of Practice for Steel Penstocks' is being written under the supervision of the Hydropower Committee of the ASCE Energy Division. The committee felt...
Diversion of the Parana River for the Yacyreta Hydroelectric Project
The diversion and closure of one of the world's largest rivers, the Parana River on the border of Paraguay and Argentina, for the 2760 MW Yacyreta Hydroelectric Project, sponsored...
Prefabricated Power Plants, Experience and Prospects
This paper presents the prefabrication concept applied to the Greenup (Greenup Locks and Dam, Ohio River, 72 MW, 1982) and the Sydney A. Murray, Jr. (Old River Control Structures, Vidalia,...
Rocky Mountain Project?Overview
The Rocky Mountain Project, in Northwest Georgia, will be a three unit hydroelectric pumped-storage project with 850,000 kW installed in an above ground powerhouse. The gross water volumes...
Return to search