In Situ Testing Performed at Jackson Lake Dam
Jackson Lake Dam was rehabilitated from 1986 to 1988 to increase seismic stability. Final foundation improvements consisted of dynamic compaction and mixed inplace soil cement columns....
Risk-Based Methodology for Seismic Rehabilitation of Earth Dams
A methodology for seismic risk analysis of earth dams is described. The procedure utilizes seismological and geotechnical inputs together with the associated uncertainties and provides...
Construction of CCM Overtopping Protection on Three Parkway Dams
Cellular concrete mat (CCM) systems have been installed as overtopping protection on three small embankment dams along the Blue Ridge Parkway. Based on field tests by others and on the...
Bond Stress Test on Rock Anchor in Clayey Siltstone
Seventy five rock anchors with design loads of 556 to 2040 kips were required for the 1000-foot long, 125-foot high, concrete gravity, Lake Lynn Dam to comply with current FERC engineering...
Improving Seismic Safety of Dams in California
A search of the dam files at California's Division of Safety of Dams has revealed that at least 94 dams have been improved for seismic stability. The results of the search are tabulated...
Development and Evaluation of Remediation Strategies by Deformation Analysis
Deformation analysis is providing guidance for the most efficient and economical seismic remedial treatments for Mormon Island Auxiliary and Sardis dams. The computer program TARA-3FL...
Seismic Stabilization of St. Joe State Park Tailings Dams
Tailings dams constructed by the `upstream' method are known to be seismically vulnerable, but field experience indicates that their seismic stability usually improves following termination...
Seismic Rehabilitation of Echo Lake Dam
Echo Lake Dam is an existing dam raising a natural lake in the Sierra Nevada in California, along the western edge of the Tahoe Basin. The dam was an embankment built with steep, hand...
Seismic Rehabilitation of Earth Dams
The purpose of this paper is to present methods available for engineered remediation of seismically deficient earth dams (not including tailings dams), review their strengths and weaknesses,...
Liquefaction Potential of Gravelly Soils in Dams
Gravelly soils are common components of embankment dams and their foundations. When such soils have been placed or deposited in a loose condition and are saturated, they are potentially...
Liquefaction Evaluation by Seismic Potential Procedure
Empirical procedures in common use for liquefaction evaluation employ information from a variety of sources in order to evaluate whether or not a site will undergo liquefaction. The information...
Software Applications for Monitoring Instrumentation Data
The initial program for reducing instrumentation data, used by the Geotechnical Branch of the Louisville District Corps of Engineers, was written in 1969. This program did not allow for...
Evaluation of Rehabilitation Needs for Hydraulic-Fill Dam
This paper describes the application of analytical methodologies developed for seismic stability analysis of dams in the western U.S. (particularly the Lower San Fernando Dam in Southern...
Testing and Evaluation of High Capacity, Multi-Strand Rock Anchors for Lake Lynn Dam
Seventy five rock anchors with design loads of 556 to 2040 kips were required for the 1000-foot long, 125-foot high, concrete gravity, Lake Lynn Dam to comply with current FERC engineering...
Ultrafine Cement Tests and Drilling Warm Springs Dam
Ultrafine cement was chosen by the Corps of Engineers for tertiary grouting the Warm Springs Dam because of its ultrafine particle size, low settlement, medium viscosity and longevity....
Experimental Evaluation of Reservoir Bottom Remediation Material
Open trenches developed through a compacted clay liner on the bottom of a reservoir. An experimental investigation has been conducted to evaluate the feasibility of using silt-sized, nonplastic...
The Use of Post-Tensioned Anchorages on the Arch Portion of Stewart Mountain Dam, Arizona
Post-tensioned rock anchorages were selected by the Bureau of Reclamation (Reclamation) to stabilize Stewart Mountain Dam against potential seismic loadings. The use of such anchorages...
Seismic Stability Modification Requirements for Pineview Dam
Pineview Dam is located 8 km upstream from Ogden, Utah, and about 8 km from the Wasatch Fault Zone. Preconstruction information and construction records available at the outset of the...
Stability of Embankments, Fills and Structures at the Bad Creek Project Under Static and Dynamic Loading
Duke Power was faced with the problem of using explosives to assist in removing a sensitive, saturated embankment cofferdam supported on a large rock plug. The first phase of the work...
The Causticity of Accelerator for Shotcrete and its Impairment on Strength of Shotcrete
How on earth is the toxic and caustic injury of accelerator for shotcrete to operators and animals? How about its impairment on strength of shotcrete? The paper gives some reports and...
Return to search