Ruedi Dam Hydropower Project
The Ruedi Dam & Reservoir is owned and operated by the Bureau of Reclamation, U. S. Department of the Interior and is part of the Fryingpan-Arkansas transmountain diversion development....

Lemon Dam Hydropower Project
The Florida Water Conservancy District (District), the entity responsible for the operation of the dam and for repayment of the costs, had been interested in the hydropower potential of...

Small Hydropower Potential in Missouri
The hydropower potential of small head plants on the Gasconade River was investigated. Since, it is felt that small head plants will have less environmental impact, thus it will be more...

Developmental Changes Due to Site Investigations
The Winooski Hydroelectric Company of Montpelier, Vermont is conducting the reconstruction of Dam #8 on the Winooski River in East Montpelier, Vermont. Unprecedented eminent domain proceedings...

Town Bluff Dam, Texas: A Federal?Non-Federal Hydropower Partnership
Town Bluff Dam is located in southeast Texas, on the Neches River about 45 miles north of Beaumont, Texas. The dam is one element of the authorized Lower Neches and Angelina Rivers, Texas,...

Development of the Owyhee Dam Hydroelectric Project
The Owyhee Project Power Committee and Owyhee Irrigation District are developing the Owyhee Dam Power Plant, currently under construction in eastern Oregon. The power plant is being constructed...

Hydroelectric Development on the Illinois Waterway
The feasibility studies and FERC License Applications were completed in August and September, 1983 for three hydroelectric projects on the Illinois Waterway at existing U. S. Army Corps...

Calaveras Pipeline Hydroelectric Project
The Calaveras Public Utility District (San Andreas, California) has a pipeline connecting its water treatment plant to the San Andreas Reservoir. By reducing the flow rate in the system...

First Impulse Turbine in the U.S. Mining Industry
The United States Bureau of Mines has funded a research project to investigate the improvements made in the operation of mine refrigeration systems when a thermal energy recovery system...

The Pelican, Alaska Hydroelectric Station
In August 1983 Pelican Cold Storage directed KPL to install a new 600 kW turbine, synchronous generator, controls and penstock transition section. This new equipment was to fit upon the...

Installation and Startup of the Idaho Falls Bulb Units
The Idaho Falls Low-Head Hydroelectric Demonstration Project consists of the redevelopment of three existing power plants using identical bulb turbines and generators. This paper summarizes...

Miramar/Alvarado Hydropower Projects
The San Diego County Water Authority (SDCWA) was organized in 1944 to provide imported water to member agencies in San Diego County. The 24 member agencies supply 90 percent of the water...

Development of Two Plants on California Canals
The projects utilize the head drop between canals on the system of the Central California Irrigation District (CCID. ) The projects utilize the elevation difference between the District's...

Design and Application of an Open-Loop Control System for Run of River Sites
This paper compares an open loop control system for variable geometry turbines to a closed loop system for fixed geometry turbines. The control systems were designed to operate three submersible...

Construction Management of Small Hydro Projects
A major driving force in the small hydro industry is the corps of private entrepreneurs actively engaged in the development of small hydro projects. While many of these developers are...

Re-Use of Civil Structures Make Norway Hydro Possible
Utilization of abandoned civil facilities made the addition of 1,800 KW to an operating 3,200 KW hydro plant of the City of Norway, Michigan Light and Power feasible. Work consisted of...

Two New Machines for Ultra Low-Head Hydropower
This paper outlines the development of two new types of positive displacement ultra low-head hydropower machines, the AUR Water Engine (AURWE) and the Salford Transverse Oscillator (STO)....

Crooke's Falls Small Hydro: A Case History
The paper discusses the background, financing, licensing and other aspects of hydroelectric power plant development at Crooke's Falls, Colorado....

Case Study?Wyre Wynd Hydroelectric Project
To combat rising energy costs, Southwire Company, a manufacturer of wire and cable products headquartered in Carrollton, Georgia, began generating its own electrical power at the company's...

The Cherokee Falls Hydroelectric Project
The 4 MW Cherokee Falls Hydroelectric Project is located near Gaffney, South Carolina, at the existing Cherokee Falls dam at mile 102 on the Broad River. The work involves constructing...

 

 

 

 