Suspended Polycarbonate Shield to Defeat Terrorist Threats
The Navy Civil Engineering Laboratory is conducting research on a window concept that offers great potential for overcoming the disadvantages of blast resistant windows. The concept is...

Limiting Performance and Design by Reanalysis of Structures for Blast Resistance
Limiting performance is the absolute optimal response of a structure under a specified transient load. Reanalysis methods are computational techniques for analyzing locally modified large-scale...

Structural Considerations of Cellular Concrete
Although not normally considered to be a structural material, cellular concrete possesses characteristics which may result in its having structural applications in building and structural...

Design of Steel Buildings for Second Order Effects
Several methods of calculating corrected effective length factors for unbraced frames are presented and discussed. In addition, an alternate format is suggested for the ASD beam-column...

New Directions in the Application of Probabilistic Concepts in the Seismic Analysis of Nuclear Power Plants
During the last 8 years, probabilistic concepts have been used in the seismic analysis of nuclear power plants. Probabilistic risk assessment (PRA) has been the primary vehicle for performing...

Detecting Underground Piping Leaks
Most leaks from underground liquid storage systems occur in the piping rather than the tank itself. The piping system is the most vulnerable component of the system, requiring great care...

Shake-Proof Dams
Seismic trouble spots in California and along the Pacific Coast usually get the most publicity. But many people don't realize that Wyoming, Illinois, South Carolina, Utah...

Digestor Do-Over
Digesters at 6 Orange County (Calif.) wastewater treatment plants needed drastic odor control rehabilitation. Repairs included epoxy patching to cracked domes, installation of a geomembrane...

Planning for Hydro Projects in an Integrated System
The Incorporated County of Los Alamos, New Mexico (County) is forming an integrated electric utility system to serve the combined loads of the County and the Los Alamos National Laboratory...

Planning and Designing the Powerplant at Stampede Dam
Power development at Stampede Dam was complicated due to the uncertainty about future reservoir operation and the need to design for seismic risk while attempting to minimize overall cost....

First Impulse Turbine in the U.S. Mining Industry
The United States Bureau of Mines has funded a research project to investigate the improvements made in the operation of mine refrigeration systems when a thermal energy recovery system...

Operation of the Annapolis Tidal Straflo Unit
The Annapolis Tidal Generating Station, located at Annapolis Royal, Nova Scotia, is the first plant in North America to generate electricity by Tidal action. The facility, rated at 19....

Valuation of System Hydro Additions
The purpose of this paper is to examine the major factors and steps which affect the valuation process of adding hydro power plants to an integrated hydro-thermal generation system. Results...

Economic Evaluation of Alternative Electric Power Developments
A hydroelectric-dominated power system and a thermal-dominated system represent different ways of meeting total electric demand, but with materially different cash flow patterns. This...

Hoover Dam Earthquakes Reconsidered
In 1936 and 1937 as the water rose behind Hoover Dam, earthquakes were felt in the Boulder City area and as far away as Las Vegas. Interest in induced seismicity was renewed in 1967 with...

Thermal Monitoring of Leakage Through Dams
The technique involves very accurate temperature measurement at shallow depth below the reach of the surface diurnal cycle. Temperatures respond to subsurface water movement (with advective...

Run-of-River Controller for Hydro Plants
New York State Electric and Gas Corporation has installed programmable run-of-river (ROR) controllers at five of their plants. Each of these plants has either two or three units with installed...

Simulation of the Pit 3, 4 and 5 Hydroelectric Project Using the USFWS Instream Temperature Model
The Pit River in Shasta County, California, is the site of the Pit 3, 4, and 5 Project (Project). A two-year Bald Eagle and Fish Study was initiated in March 1983. As part of the overall...

Seismic Isolation System for a Floating Dry Dock
The seismic isolation system consists of two dolphins, each a relatively large-diameter cantilevered steel pipe pile anchored in Franciscan rock, and buffered connections to the floating...

Adfreeze Strength of Ice to Steel Pipe Piles as a Function of Temperature
A study was initiated to determine the adfreeze bond strength between steel pipe piles and freshwater ice as a function of temperature. Tests were conducted at an average strain rate of...

 

 

 

 

Return to search