Integrating Voice Recognition Systems with the Collection of Project Control Data
The Construction Industry in the 1990's will be dominated by emphasis on Productivity, Competitiveness and Innovation. Success or failure in these areas lies in one word, Technology, and...

Actual Vs. Expected Performance of Small Hydro Projects
This paper presents the results of several case studies of small hydro projects that compare the expected performance with the actual performance as measured in terms of energy generation....

Small Hydro Analysis and Reporting Program
The Ontario Ministry of Energy initiated a project to develop an analysis program based upon metric measures and Canadian costs. The Ministry of Energy of the Province of Ontario has been...

Cumulative Impact Assessment: Application of a Methodology
The authors expanded upon the Federal Energy Regulatory Commission's (FERC) Cluster Impact Assessment Procedure (CIAP) to provide a practical methodology for assessing potential...

Rain Data Telemetry for Operation of a Hydro-Reservoir
The Collywobbles hydro-electric station operates 42MW with very little river storage. Raindata is collected from 11 gauges distributed in the 5000 km**2 catchment and telemetered to a...

Early Detection of Rotor Cracks?Monitoring & Methodology
This paper describes a diagnostic method for the early detection of shaft cracks on rotating machines. The method is based on interpretation of the lateral synchronous (1x) and twice per...

Generators with Shaft Mounted Turbine Runners
Water turbine runners mounted on an extended generator shaft are often specified to eliminate turbine bearings and the flexible shaft coupling. Two bearing single shaft turbine generator...

Design Data of Pump-Turbine and Francis Turbine Units
Some basic statistical data covering geometrical and energy parameters for Francis turbine and Pump-turbine units are presented. These data are further compared as specific ratios for...

Selection of Turbine Diameter and Speed for Francis, Kaplan, and Pelton Hydraulic Turbines
This paper is a continuation of work presented at WATERPOWER '83 and presents up-to-date information on the selection of diameter and speed for Francis, Kaplan, and Pelton...

Tracer Dilution Flow Measurement Application to Short Penstock Length
Absolute performance evaluation of hydro-turbines requires the determination of flowrates. Flow measurement is probably the most difficult aspect of determining a unit's efficiency....

Turbine Efficiency Monitoring Utilizing Ultrasonic Flowrate Measurement
On-line turbine efficiency measurement can be achieved by ultrasonic flowrate measurement and state-of-the-art data acquisition techniques. A field performance test program conducted at...

Field Testing: Producing Complete Test Results on Site, A Realistic Objective
Modern technologies and instruments have had an influence in nearly every field imaginable. At Hydro-Quebec, the last ten years have brought about a complete transformation in the way...

Hydro Machinery Problem Solving Experiences
Within the last decade the use of modern data acquisition instrumentation and techniques have moved the subject of the machinery problem solving into a more scientific arena. This paper...

Index Testing With a Data Acquisition and Control System
A computer controlled index test has been developed that can be used to optimize blade-gate relationships on adjustable blade (Kaplan) hydraulic turbines. This paper includes hardware...

Basic Considerations in Governed or Non-Governed Small Hydro Power Plants
This paper reviews the necessary studies and major considerations that must be completed for proper coordination and selection of a turbine governor, and generator. A discussion of the...

Grand Coulee SCADA System Procurement
Purchasing a quality Supervisory Control and Data Acquisition (SCADA) or Energy Control System (ECS) at a reasonable price for a particular installation can be a challenging undertaking....

Kaplan Blade Angle Controller
This paper describes a recently developed computerized Kaplan blade angle controller that is capable of improving turbine performance. Model Tests or Index Tests produce the Three-D-Cam...

Capabilities of Automated Control System Employing Advanced Programmable Controllers
This paper details Voith Hydro's range of experience in the use of Programmable Logic Controllers (P. L. C. 's) in the automation of new hydro electric sites....

Integrated Automatic Hydroelectric Plant Control
The increased acceptance and employment of microcomputers to control specific functions in small hydroelectric plants has led to computerized integrated total control of hydropower generation....

Accelerated Life Testing of Generator Coils
This paper presents a step-by-step procedure for doing a 400 hour, 60 Hz, 90 degree C accelerated life test on generator coils. Test procedure is as follows: 1. Initial coil examination...

 

 

 

 