Dynamic-Fatigue Response of Continuous Composite Bridges
The dynamic response of continuous composite bridges and the influence of fatigue loading at resonance frequency on the structural response are investigated. It is shown that cracking...

Seminar Summary and Research Needs
All the papers presented in the technical sessions of the seminar are summarized and, in some cases, commented upon. The needed research in composite and mixed construction is described....

Rebuilding America
Infrastructure Rehabilitation
The future of the nation demands a solution to the problem of our deteriorating infrastructure. Civil engineers are called on to act as guardians of our public works facilities that must...

Environmental Infrastructure: Does Civil Engineering Education Meet the Challenge?
The author explores some avenues for re-direction of the civil engineering education process to become more responsive to the needs of infrastructure re-development in the areas of water...

A Stepwise Approach to Environmental Systems Maintenance Management
This paper provides a systematic approach to establishing a maintenance management program for environmental infrastructure. It begins by discussing the definition of program objectives,...

Roller Compacted Concrete
Roller compacted concrete has emerged recently as an economical material and rapid method of construction for use in gravity dams, overflow structures and heavy duty pavements. The economics...

Fisheries Planning for Northern Territory, Australia
On behalf of Northern Territory Government the consultants have studied the potential for development and reviewed the present infrastructure. Opportunities as well as constraints to development...

Unique Utilization of a Physical Model to Develop a Construction Sequence of a Major Cofferdam
Lock and Dam 26 Replacement is being constructed on the Mississippi River about 2 miles downstream of the existing Locks and Dam No. 26 at Alton, Illinois. This paper discusses the unique...

Emerging Technology?A Solution to Airport Access Problems
This paper reviews airports which presently have employed people movers, the problems they are solving, and potential use for solving access problems and create added value for the investment...

Simulating Construction Operations by Microcomputer
Field operations on major construction projects involve complex interactions among construction equipment, materials and supplies, skilled craft resources, and technical and administrative...

Inspection Costs Versus the Benefits Derived
The following text describes the experiences of a small suburban municipality located in Middle Tennessee before, during and after a five-year program of comprehensive inspection and testing...

Design, Construction & Performance of Fades Dam
The project, construction and performance of les Fades dam are described. Les Fades dam is one of the first concrete faced rockfill dams compacted with a vibratory roller. A vibratory...

Alto Anchicaya Dam?Ten Years Performance
The general aspects of design and construction of the Alto Anchicaya Dam duilt during 1970 - 1974 in Colombia, South America are described. The paper refers to the performance of the structure...

Golillas Dam?Design, Construction and Performance
Golillas Dam is a concrete face, gravel fill dam, 125 m (410 ft) high built seven years ago that has had some difficulties during its initial operating years; due to the shape of the canyon,...

Concrete Face Rockfill Dams of the Winneke Project
Two of the three dams forming the Winneke Reservoir, near Melbourne, Australia, are concrete face rockfill dams. A minor dam forming the sludge storage pond for the project's...

Foz do Areia Dam?Design, Construction, and Behaviour
The 525 ft (160 m) high Foz do Areia dam in the Iguacu River, Parana, Brazil, built by 'Companhia Paranaense de Energia - COPEL', between 1975-1980, is part of...

Construction of Foz do Areia Dam
The methods and equipment for the construction of Foz do Areia Dam during 1976-1980 in Brazil are described. Special emphasis is given to the rockfill construction. Foz do Areia was the...

Fortuna Concrete Face Rockfill Dam
The Fortuna Dam is a 60 m high concrete face rockfill dam located in Panama, designed to be built in two stages. This paper describes the construction of the first stage dam, 60 m high,...

Construction and Performance of Salvajina Dam
Salvajina Dam was constructed between July, 1982 and November, 1984. Relevant construction aspects are described, particularly those related with procedures and statistical data of the...

Design and Construction of Terror Lake Dam
Terror Lake Dam is a central feature of the 189 million Terror Lake Hydroelectric Project, located on Kodiak Island Alaska. The dam is a 193-feet (59 m) high concrete-faced zoned rockfill...

 

 

 

 

Return to search