On-Orbit Assembly and Refurbishment of Lunar Transfer Vehicles
Initial flights of space-based manned lunar transfer vehicles (LTV) will require some on-orbit assembly and checkout due to mass and volume limitations of the Earth-to-orbit (ETO) launcher....

Space Habitat Contaminant Growth Models?Part II
This paper reports on the continuation of work being done at NASA's Center for Space Environmental Health (CSEH) at the University of Colorado at Boulder on contaminant growth modelling...

Modular Robot Testbed
One approach to non-terrestrial construction involves the use of small, inexpensive, modular robots rather than expensive one-of-a-kind construction tools. The Modular Robots Testbed at...

Mitigation of Dust Contamination During EVA Operations on the Moon and Mars
The Space Exploration initiative is charting a new course for human exploration of the Moon and Mars. Advances in EVA system have been identified as being critical for enabling long-duration...

Architectures for Mission Control at the Jet Propulsion Laboratory
One of the most vital, but often overlooked, research areas for space missions is flight operations. The imbalance is caused by many factors. Among them, the manner in which space missions...

Thermal Investigation of a Large Lunar Telescope
Recent interest in construction of a large telescope on the Lunar surface (Nein and Davis, 1991; Bely, Burrows, and Illingworth, 1989) has prompted this feasibility study of a thermal...

The Design and Use of Flow-Through Hold Pads
The Chicago Delay Task Force recommended the construction of nine largescale, flow-through hold pads at Chicago O'Hare International Airport to reduce the potential for airfield gridlock....

Fine Tuning the Airfield: The New Denver International Airport
This paper discusses airfield layout considerations that have been incorporated into the design of the new Denver International Airport (DIA). These concepts include some unique provisions...

Characteristics of High-Speed Runway Exits for Airport Design
This paper addresses some of the geometric design and operational characteristics of high-speed runway exists. Lateral and longitudinal runway constraints limiting the use of high-speed...

The Army Aviation Team from a Military Civil Engineer's Perspective
The Technical Session for which this paper is written is 'Airfield Pavements - A Team Effort.' As such, the emphasis on this paper is the United States Army Aviation Team, and not the...

The New Munich Airport?Planning, Construction and Opening of a New International Turnstile Airport in Europe
The new Munich airport that began operations just recently dates back to the mid-1950. The paper discusses the general expansion plan which includes site selection; runway system planning;...

Soft Touch People Mover Central Control
The people mover central control systems perform many automatic functions, are built with off-the-shelf redundant hardware, include advanced color graphics and touch screen operator interfaces,...

The Design of the Airside Concourses
The growth of commercial air traffic in the United States has resulted in the development of the 'New Denver International Airport.' the airside concourses were designed by joint venture...

Airport Landside Management: An Unique Airport Specialty
Air transportation has become a common and preferred method of travel, resulting in an ever increasing number of air passengers. The significant growth has resulted in unique and never...

Opportunities for Fixed Rail Service to Airports
With the increase in air passenger traffic and related ground access congestion many cities are examining potential links between regional transit systems and their airports. A working...

Baggage System Implementation at DIA
BAE Automated Systems is currently under contract to supply the complete, Integrated Automated Baggage Handling System (IABHS) for the New Denver International Airport. The system represents...

Planning and Budgeting for FAA Facilities and Equipment
Establishing new Federal Aviation Administration (FAA) facilities and equipment (F&E) requires long lead-time planning and through processing in a three-year budget cycle to achieve...

Impact of the New Denver Airport on the Air Traffic Control System
Building the new Denver Airport has two major impacts on air traffic control: first, it requires redesigning the airspace surrounding the Denver area; and second, it requires moving to...

The Airport Traffic Control Tower for the New Denver International Airport
Developing a new airport traffic control tower involves many complexities of planning, engineering, and coordination. For the ATCT at the New Denver International Airport, these complexities...

Traffic Data Collection: What Really Needs to be Done?
The collection of 'existing' traffic data such as the 24-hour counts, turning movement counts, driveway volumes, and vehicle classification counts near the proposed project site becomes...

 

 

 

 

Return to search