Hydroturbine Intake and Penstock Geometry Design
This paper studies the intake design of one hydroturbine site and the penstock trifurcation design of another site. A hydroturbine site had been built and was in operation when vortexing...

Design and Manufacture of Turbine Runner Blades Using CAD/CAM-Technology
Interactive blade design, fluid flow analysis, stress analysis and NC-matching of both model and prototype blades are working from a common data base and are demonstrated in this paper....

Computerized Engineering for the Hydraulic Design of Hydro-Turbine Stay Vanes
To design a turbine stay vane as an integral part of the spiral case/stay vane/wicket gate waterpassage, both the vane geometry and the gate/vane position must be developed and analyzed....

Advance Prediction of Flow-Induced Variations
Frequency analysis of hydraulic vibrations has been applied using a transfer matrix and impedance method. The computer program is given for the self-excited and forced vibrations, together...

Open Flume Turbine Intake Geometry
An inexpensive physical hydraulic model was used to investigate the geometry of two different open flume turbine intakes. One intake utilized an inverted, fabricated pump bell type of...

Diffuser Performance for Draft Tube Applications
Available information on diffuser performance is summarized in relation to draft tube applications. This paper is particularly directed at the implications of basic research with these...

Leakage from Pressure Tunnels and Shafts
Several issues related to leakage from unlined pressure tunnels and shafts are reviewed and discussed. They include confinement, or cover requirements relative to hydraulic jacking of...

Analysis and Testing of Transient Pressures at Camp Far West Hydroelectric Project
The objective of this paper is to present a comparative discussion of the results of theoretical analysis of transient pressures and of field tests performed on the Camp Far West Hydroelectric...

Hydraulic Machines Model Acceptance Tests
The article begins with a description of the modern test installations, giving the dimensions of the models most frequently used and the head heights. Attention is then given to the most...

Hoover Dam Earthquakes Reconsidered
In 1936 and 1937 as the water rose behind Hoover Dam, earthquakes were felt in the Boulder City area and as far away as Las Vegas. Interest in induced seismicity was renewed in 1967 with...

Nanpil River Hydropower Project Pohnpei, Federated States of Micronesia
The Nanpil River Hydropower Project is a 1600 KW run-of-the-river hydropower project located on the tropical island of Pohnpei, Federated States of Micronesia. The hydropower project will...

Thermal Monitoring of Leakage Through Dams
The technique involves very accurate temperature measurement at shallow depth below the reach of the surface diurnal cycle. Temperatures respond to subsurface water movement (with advective...

Rapid Filling of Reservoirs
The rate of filling a reservoir, particularly for the first time, is governed by various factors. While economic considerations may favor rapid filling of reservoir to operational levels,...

Carmen-Smith Uprate & Modernization
The Carmen-Smith Powerhouse is located on the upper McKenzie River, 75 miles northeast of Eugene, Oregon. Carmen's two nearly identical 42. 1 MVA vertical hydroelectric turbine...

Modernization of Existing Hydroelectric Power Stations in Conjunction with Conversion to Automatic Operation
The easiest and, in the long run, the least expensive method in most cases is the installation of an electronic turbine governor that is not only easy to incorporate in the power station...

Analysis of Expanding the Wolf Creek Powerplant
The Nashville District, Corps of Engineers, is examining the feasibility of expanding the Wolf Creek powerplant to increase its peaking capability. The economic analysis of peaking expansions...

Siphon Penstock?An Economic Way to Develop Hydros
As part of the 48 MW Jim Falls Hydro Redevelopment Project by Northern States Power Company, a minimum flow powerhouse was constructed with a siphon penstock. The Minimum Flow Unit (MFU)...

Competitive Model Testing for Replacement Runners at the Wells Hydroelectric Project
The Wells Hydroelectric Project, located on the Columbia River, contains ten Kaplan-type turbines. The plant has been in commercial operation since January, 1969. The runners have a long...

Negotiating Environmental Protection Measures with Resource Agencies: Twin Falls and Weeks Falls Hydroelectric Projects, Washington
The planning and licensing process for the Twin and Weeks Falls Projects involved resolution of numerous regulatory and environmental issues, including the need for cumulative impact analysis...

Dust Control at Canyon Ferry
Since initial filling of Canyon Ferry Lake in 1955, wind blown, fine grained material from exposed flats at the upper end of the lake became a problem of increasing concern. Average deposition...

 

 

 

 

Return to search