DScheduler: A Deductive Database for Scheduling Building Construction Tasks
Computer applications in the construction domain, such as construction scheduling and estimation, require a large amount of data. Reasoning with complex data is facilitated by Artificial...
Construction Information Management
Use and characteristic of Information Systems in the organizations has been changed significantly. These systems are not functionally oriented any more and they do not have any bias toward...
Containing Construction Change with Computers
This paper discusses the benefits of managing construction change orders with computers over manual methods. Construction contracts formulate change procedures that are often at odds with...
Space Schedule Construction
The layout of temporary facilities on a construction site is affected by changes in a construction schedule, including changes in activity duration, resource selection, and resource allocation...
Using Product Models to Plan Construction
The conceptual design of the CasePlan case-based planning and scheduling system is presented. Case-based reasoning is a promising technique for capturing the expertise of contractors who...
Pre-Design Planning with Intelligent Project Development Brochure (IPDB) System
The functional design criteria and other technical requirements are to be established during the pre-design planning stage of a project. At this pre-design stage, the formulation of the...
Resource Constrained Time-Space Scheduling Model
This study aims to develop a resource constrained time-space scheduling model, mainly aiming application to pipeline laying world for gas supply under roads in urban area. This model can...
Graph?database of Large Dams in China (GLDC)
GLDC is a software with the dynamic processing and categorizing of the main graphs and data of the large dams in China. It can run by means of screen sidebar menu and in interactive mode...
Rive, Rive-Grown and Burst Probability of Rolled Compressive Concrete Arch Dam
The rive, every step of the rive grown and even burst of arch dam are regarded as sequence random events. Making use of the probability theory and the achievement of elastic, elastic-plastic...
The Application of Gauss Numerical Integration Method in Arch Dam Trial-load Method Program
The characteristics of Gauss Numerical Integration Method are the unequal distance between nodes and fairly high accuracy. When the number of nodes is n, the algebraic accuracy can be...
Scheduling of Multi-Story Buildings in a Constraint Environment
Scheduling involves the allocation of resources over a period of time in order to perform construction activities, satisfying project constraints. These constraints, if present, must be...
Model-Based and Interactive Planning for Predictive Plant Maintenance Management
Maintenance of process in power plants represents about 30% of the operating cost of these plants, including the cost of repair labor, materials and out side services but not the cost...
An Integrated Acquisition, Storage and Retrieval Multimedia System for Constructibility Lessons Learned
Constructability is defined the optimum integration of construction knowledge and experience during conceptual planning, engineering, procurement and field operations to achieve overall...
Evaluating the Use of Smart Card Systems in the Provision of Rural and Small Urban Transit Services
The overall aim of this paper is to provide assistance and direction to persons interested in assessing the use of smart card systems and other advanced public transportation systems (APTS)....
Fit to Drink
Amendments to the Safe Drinking Water Act (SWDA) in 1986 greatly expanded the number of contaminants subject to regulation and significantly beefed up water quality treatment and monitoring...
Managing the Data Explosion
Sound data management practices have always been central to a successful project. However, the data explosion brought on by high-tech electronic sensors and automatic samplers can exceed...
The Denver Airport: Managing a Megaproject
If the 53 sq mi, $2.7 billion Denver International Airport seems daunting in size, imagine trying to manage its construction. Supported by over 100 firms, the five year-long project is...
Invasion of the Zebra Mussels
At first glance, the zebra mussel looked like doom for freshwater users in the Great Lakes: small, hardy, incredibly prolific European mollusks with an affection for freshwater intakes...
Rocky Mountain Hydro
By May 1995, the $700 million Rocky Mountain Pumped Storage project will bring 850 MW of peaking power to a large part of the population in northwest Georgia. Its opening will mark only...
After the Blast
On February 26, 1993, a bomb exploded in an underground parking garage beneath the World Trade Center, killing six, causing hundreds of millions of dollars in damage and leaving a crater...