Energy Facilities Going Underground
Environmental pressures, combined with continuing development of hard-rock excavation techniques, have turned attention to the placement of major engineering facilities underground. Primary...

Proceedings Volume I
Polyphase Flow Transients Pressure Recovery Devices Intake Structures Cooling Water Systems
The papers presented in these proceedings represent a variety of disciplines from many countries. This unique jointing of three major societies has created a collection of papers with...

Soil Improvement
History, Capabilities, and Outlook
This report is intended to help engineers meet the need for practical, efficient, economical, and environmentally acceptable means for improving unsuitable soils and sites, for expanded...

Pitfalls of Overconservatism in Geotechnical Engineering
The article cites at least three reasons why geotechnical engineers may be overconservative: (1) They may try to satisfy unreasonable standards established by themselves or others; (2)...

Mammoth Transshipment Terminal Links Montana Coal to Michigan Power Plant
In 1973 Detroit Edison contracted with the Decker Coal Company for 200 million tons (181 Tg) of Western low-sulphur coal over a period of 26 years to meet its requirement for low-cost,...

Filter Fabrics in Shore-Protection Structures: Save Money, Ease Installation
Over the past decade, plastic filter fabrics have seen growing use in shore-protection structures (e.g. revetments, breakwaters, jetties), river-bank protection schemes, and other areas...

Exxon's Offshore Platform Nearly Doubles Water-Depth Record
In 1976, Exxon erected near Santa Barbara (Los Angeles metropolitan area) the Hondo platform, in 850 ft of water. This is nearly twice the previous record depth established in the North...

Sand and Gravel � Don't Take Them for Granted
One assumes the supply of sand and gravel is inexhaustible. In fact, at certain times and places it is not. At least not at today's relatively low prices. This is particularly...

Recording River and Reservoir Water Depth
At the Kerr Reservoir on the Roanoke River in Virginia and North Carolina, reservoir bottom was surveyed before reservoir filling and twice thereafter, to determine rate of siltation....

Precast Veneer Replaced By All-Precast Structure
Utilizing engineering solutions to architectural problems greatly enhanced the architectural appearance of this building. Long-span prestressed, light weight concrete beams, post-tensioned...

Vibroreplacement and Reinforced Earth Unite to Strengthen a Weak Foundation
Two relatively new engineering concepts in the U.S. were successfully used to solve a difficult soils problem. A highway skirting Idaho's Lake Pend Oreille was built on a...

Minnesota Interceptor Sewer Breaks New Ground
The Beltline Interceptor is a gravity interceptor sanitary sewer which has its outlet in St. Paul and its beginning in White Bear Lake. Major requirements called for a design which would...

King Post Truss System Cuts Roof Framing Cost by 30%
The design was based on requirements for minimally obstructed sight lines (Robin Hood Dell Open-Air Theater, Philadelphia, Pa.) for outdoor seating and a tight construction budget of $4,500,000....

Ecology and the Past
Archaeologists and paleontologists have gathered an overpowering amount of evidence to show that modern methods of construction, both in the field of highways and in that of architectural...

Channel Siltation Determined with Side-Scan Radar
Of the new electronic means to measure water depth, side-scan sonar is unusual in that it gives not just a cross-section of the bottom but a semi-3-D picture of the bottom surface. Experienced...

Terrain Analysis for the Trans-Alaska Pipeline
Airphoto interpretation and field reconnaissance were combined with a computer-based data bank to evaluate the diverse terrain conditions along the Trans-Alaska Pipeline because acquisition...

Fabric Roofs Feel the Pressure
Plastic-coated fabric roofs have been growing in popularity with uses ranging from covering a football stadium in Michigan to housing satellite-tracking stations. Article takes a look...

Teton Dam Failure
In June 1976, Teton Dam in Idaho failed. It was an earthfill dam 305 ft high. It failed by piping through the impermeable core of the dam. Among factors believed contributing to failure:...

Liability Claims Against Soils Firms Slashed Dramatically
In 1969, consulting engineering firms engaged on soil and foundation engineering were virtually uninsurable. Taking the bull by the horms, a group of 10 soil and foundation engineering...

502-ft Diameter Laminated-Timber Dome Provides Fast, Low-Cost Cover for Arizona Stadium
Varex Dome, a 502-ft diameter engineering marveel of glue laminated timber, was built in record six months erection time. This dome shell structure forms both walls and roof for the new...

 

 

 

 

Return to search