An Integrated Computer Model for Project Schedule Updating
Current schedule updating techniques rely mainly on field reports to specify completed work. Information provided in these reports are then manually summarized, analyzed, and input to...

Overlaying Digital Images with 3-D CAD to Document as Built Construction
A persistent problem in construction has been documenting changes which occur in the field and preparing as-built drawings. The accuracy and completeness of field measurements is often...

Graphic Visualization for Planning Heavy Lifts
The application of graphical visualization to construction can serve a wide variety of objectives and offers many significant benefits. Heavy lifts are an important component of industrial...

Building Product Model, A First Brick in Computer Integrated Construction
This paper describes the development of a product model as a basis for an information system. This new approach is based on modelling functions of building units rather than physical entities...

Developments to the IRMA Model of AEC Projects
The rapidly advancing fields of information technologies (IT) for AEC and computer-integrated construction (CIC) rely on the ability to represent and exchange information about AEC projects...

Information Modeling and Applications
The objective of this paper is to describe events and findings in the development of a comprehensive information architecture for a building. The information architecture has a goal of...

Machine learning Applications for Automated Constructability Reviews
Knowledge acquisition of the project design and construction site conditions is essential for determining construction project complexity. An effective knowledge acquisition method is...

Time-related Deflections of Cantilever Bridges
Many prestressed concrete bridges with spans between 100 and 160 m have been built in the Netherlands. The method of construction is the so-called in situ free cantilever construction....

An Artificial Neural Network Approach to Allocating Construction Resources
This paper presents an approach to alleviate the problem of depending upon human expert in allocating construction resources. This approach is using artificial neural networks to capture...

SELECTCRANE: An Expert System for Optimum Crane Selection
Every major project undertaken today requires the services of a crane(s) to ensure that all materials and equipment hoisting and placement are performed in the most efficient manner. The...

Construction Expertise Transfer with Knowledge Based Systems
The experience held by a cost estimating engineer is a valuable asset in every construction company. For a reliable cost estimation at the conceptual stage of a building project, the missing...

Intelligent Construction Planning
The intelligent construction planning is a stage of automated building realization process. The building is defined in the design stage by its spaces and functional systems. The automated...

Conceptual Models of Product, Project and Document Data; Essential Ingredients of CIC
A number of current on-going national and international standardization efforts which develop standards for information structures in construction are reviewed in the paper. These concern...

Prototype Applications of Integrated Data Models in Construction
Problems in computer integrated construction arises not only from a lack of technically proficient models of data integration but also its lack of experience and understanding of how such...

How do Integration and Data Models Add Value to a Project?
Integration has been at the forefront of research agendas of universities and restructuring efforts of companies in the past few years. However, we are still lacking a common understanding...

Object-Oriented Process Modeling to Support Cooperative Planning in Industrialized Building Construction Project
This paper presents current research and develop on process modeling that can support cooperative planning among designer, engineer, project planner and project manager in industrialized...

An Inductive Knowledge-Based System for Mitigation of Bridge Fabrication Errors
Fabrication and erection of steel bridges are very error-prone processes. Bridge engineers at the Kansas Department of Transportation (KDOT) felt that there is a need for the development...

A Knowledge-Intensive Database System for Making Effective Use of Construction Lessons Learned
The Constructability Task Force of the construction Industry Institute (CII) sponsored as series of studies which advocate construction expert input to the conceptual planning, engineering...

Creating and Abstracting Lessons-Learned from BCO Reviews
This database allows reviewers searching for relevant past expertise access to a relatively small set of comments that have been retained frequently for past reviews. The ability to order...

Three-dimensional Modeling for Improving Construction Process Performance
This paper presents experimentation regarding a model for deciding the optimum number of resources that should be allocated to a project. Measures of task and process flexibility are used...

 

 

 

 

Return to search