Demand/Supply Relationship in Transportation Network Design Problems: A Genetic Algorithm Approach
The cumulative genetic algorithm (CGA) has its significant advantages over the heuristic algorithms in dealing with transportation network design problems. Using CGA, the entire solution...

An Artificial Neural Network Approach to Pavement Maintenance Decision Support System
An important component of any Pavement Maintenance Decision Support System (PMDSS) is the condition survey and rating procedures. Data obtained from these procedures are the primary basis...

SELECTCRANE: An Expert System for Optimum Crane Selection
Every major project undertaken today requires the services of a crane(s) to ensure that all materials and equipment hoisting and placement are performed in the most efficient manner. The...

Construction Expertise Transfer with Knowledge Based Systems
The experience held by a cost estimating engineer is a valuable asset in every construction company. For a reliable cost estimation at the conceptual stage of a building project, the missing...

Prototype Applications of Integrated Data Models in Construction
Problems in computer integrated construction arises not only from a lack of technically proficient models of data integration but also its lack of experience and understanding of how such...

How do Integration and Data Models Add Value to a Project?
Integration has been at the forefront of research agendas of universities and restructuring efforts of companies in the past few years. However, we are still lacking a common understanding...

Object-Oriented Process Modeling to Support Cooperative Planning in Industrialized Building Construction Project
This paper presents current research and develop on process modeling that can support cooperative planning among designer, engineer, project planner and project manager in industrialized...

Flexible Extracation of Practical Knowledge from Bridge Databases
Bridge databases contain significant information that can assist in future bridge management decisions. The effective utilization of this information requires facilities for the flexible...

Adaptive Instructor Model for an Engineering ITS
To develop intelligent tutoring systems (ITS) for engineering via computer technology, a model of how engineers learn as well as methods in which instruction should occur must be captured...

An Inductive Knowledge-Based System for Mitigation of Bridge Fabrication Errors
Fabrication and erection of steel bridges are very error-prone processes. Bridge engineers at the Kansas Department of Transportation (KDOT) felt that there is a need for the development...

An Interactive Computer Code for Generations of Artificial Earthquake Records
A new interactive computer code is presented in this work for the calculation of artificial earthquake records that comply with any arbitrarily specified target response spectra or power...

Best Route GIS System
A GIS systems was developed for determining the best route to travel, so that the traveler will travel to a number of cities in such a way that he/she will visit each city only once and...

GIS Modeling of Neo-Traditional Neighborhood Development
Emerging strategies for land use development suggest that neo-traditional neighborhoods promote increased accessibility with reduced traffic congestion compared to current suburban developments....

A Knowledge-Intensive Database System for Making Effective Use of Construction Lessons Learned
The Constructability Task Force of the construction Industry Institute (CII) sponsored as series of studies which advocate construction expert input to the conceptual planning, engineering...

Creating and Abstracting Lessons-Learned from BCO Reviews
This database allows reviewers searching for relevant past expertise access to a relatively small set of comments that have been retained frequently for past reviews. The ability to order...

Three-dimensional Modeling for Improving Construction Process Performance
This paper presents experimentation regarding a model for deciding the optimum number of resources that should be allocated to a project. Measures of task and process flexibility are used...

Alternative Decisions for Space-Based Scheduling in Multi-Story Projects
SCaRC (Space-Based and Resource-Based) is a prototype knowledge-based scheduling system that acknowledges work space as a scheduling constraint. The SCaRC system comprises different scheduling...

MoveCapPlan: In Integrated System for Planning and Controlling Construction Material Laydown and Handling
This paper focuses on modeling and improving flow. It presents a computer-based system for planning and controlling construction material laydown and handling. This system, named MoveCapPlan;...

Extended Topology in Building Design Systems
An important aspect of CAD systems for building design concerns the description of the form of the building, the definition of operation on that form and the way these operations are offered...

Integrated System Environment Using an Object-Oriented Project Model with Multiple-Views
This paper describes the development, present status and future directions for PMAPM, an object-oriented project model designed to facilitate information sharing along the paths through...

 

 

 

 

Return to search