Infrastructure: Rehabilitation or New
Basically, each public entity needs to inventory its infrastructure system and evaluate its importance to the immediate requirements of public health, safety and welfare. Prioritize the...

Rehabilitation of the CNW and ICG Railroads
The railroad industry is an indispensable part of the American economy. However, the railroad infrastructure was allowed to deteriorate to the extent of having 5. 4 billion in deferred...

Innovative Solution for Urban Freeway Reconstruction
Technology which was developed for economic and rapid construction of precast concrete segmental box girder bridges is being utilized to permit the reconstruction of an urban freeway in...

Golden Gate Bridge: Deck Replacement
A major inspection of the Golden Gate Bridge in 1968-69 found the reinforced concrete roadway of the Bridge to have widespread defects and local failures. Further investigations found...

Tunnel and Bridge Construction with Minimum Disturbance to Overhead Services
The rapid growth of pipe jacking over the last 20 years and the improvement and development of methods in terms of lengths of drive, size and ability to work in varying ground conditions...

Who is Managing the Rebuilding of our Infrastructure
Determining the nationwide infrastructure needs and identifying the organizations responsible for this assessment are complex processes. Yet, if this nation is to have an organized, orderly...

Infrastructure Project Management and the Power of Implementation
The purpose of this paper is to bring renewed attention to project management concepts and public policy implementation issues as they apply to infrastructure development and renewal....

Infrastructure Awareness: Successful Techniques
The need to rehabilitate and upgrade our infrastructure systems, specifically the systems of water supply and distribution, wastewater collection and treatment, bridges, highways and mass...

Getting Started
The need for increased funding for infrastructure maintenance and rehabilitation is a well recognized problem at all levels of government. Obtaining those funds has proven a difficult...

The National Infrastructure Act
Today, more than ever before, the United States faces a serious problem related to the condition and adequacy of its basic infrastructure - surface transportation, water supply and distribution,...

Legislating for Infrastructure Investment
It is apparent that today's infrastructure problems require innovative solutions reflecting national spending trends, the size of the federal budget deficit, and individual...

Geotechnical Aspects of Strontia Springs Arch Dam
The bedrock at the Strontia Springs damsite consists of generally excellent quality granitic and metamorphic rock, except for a wide shear zone located beneath the dam in the lower valley...

Construction of Strontia Springs Dam
Strontia Springs Dam is a principal feature of the Foothills Project on the South Platte River, 25 miles southwest of Denver, Colorado. The dam provides for storage and diversion of water...

Concrete Quality Control and Quality Assurance on Strontia Springs Dam
An essential part of the construction management services provided on Strontia Springs Dam was the quality control of material, mixture proportions, and production for all concrete placed...

Dam Pioneers Concrete Variant
The Willow Creek Dam in Oregon is the nation's first dam made entirely of roller compacted concrete. The design and construction of this dam are described and special problems...

Bid-Rigging: An Inside Story
William Carter, engineer and ASCE member, spent five months in prison in 1980 on conviction of conspiracy under U.S. antitrust laws in a case involving a Tennessee highway project for...

Construction Management: Dallas North Tollway Project
This article will attempt to illustrate the importance of flexibility of the design and construction inspection process to insure the project is constructed within the time and budget...

Embankment Seepage Control Design and Construction
For seepage control features of embankment dams, design criteria and construction practice is reviewed as it is reflected in the experience of the U. S. Army Corps of Engineers. The generally...

Prediction of Highway Construction Noise Levels
A model for the prediction of noise levels from highway construction operations has been developed under sponsorship of the Federal Highway Administration (FHWA). Noise sources are geometrically...

Composite Bridge Design in Germany
A span length between 40 m and 12 m has been regarded as optimal up to the mid-60's for a composite design to compete with prestressed concrete or steel alternatives. With...

 

 

 

 

Return to search