Exhibits Under Fiberglass
The San Diego Convention Center, scheduled for completion in 1988, is located on 11 acres of downtown land only 150 ft from the bay. It will cost $130 million for total of 1.7 million...

Relicensing/Renewal and Coordinated Consultation
A project which has been constructed and operating for a number of years offers a substantial set of empirical data for assessing how - and by whom - the project should be continued in...

Observations and Experiences of Bulb Turbines
This article gives a short historical review of the introduction, construction and development of bulb turbine plants in Sweden. The article relates some of the experiences of the designers,...

Resolving Environmental Conflicts During Licensing?A Case History
Vischer Ferry and Crescent Dams are located on the lower Mohawk River near Albany, NY. In September 1982, the Power Authority of the State of New York filed license applications with the...

Performance Study of the Lagoon at Inuvik, N.W.T.
Since 1957, Inuvik's sewage has been discharged into a lagoon situated northwest of the townsite. In 1982 the lagoon was upgraded to a two-stage system. Two primary cells...

The Effect of Water Supply and Sanitation Systems on Disease Patterns on Manitoba Indian Reserves
This study examines the links between water supply and sanitation and health on Indian reserves in Manitoba. Health data on water related diseases were obtained from health care agencies....

Turnaround in Houston
Simply implementing the suggestions of the workers building a 14-story garage in Houston, turned a disaster in the making into a project ahead of schedule and under budget. The work force...

Occupant Risk in Longitudinal Barrier Collisions
The following paper presents data derived from sled test experiments, full-scale vehicle crash tests as well as an in-depth analysis of accident data which suggest that occupants are not...

Demands and Means for Construction Innovation
Increasing complexity of the facilities owners need, increasing concern by owners regarding the cost effectiveness of investments in constructed facilities, and growing capability and...

Seismic Risk Assessment for a Utility System
Presented is a procedure by which a utility could develop the probabilities for different levels of capital loss exposure for its system. The procedure relies on experience data obtained...

The Effects of the 1985 Mexico City Earthquake on Underground Water & Sewer Pipelines
The 1985 Mexico City Earthquake left thousands dead and many thousands more without shelter. The visible damage was immense and terrible, and familiar to people around the world through...

Future Containerships from a Ship Owner's Viewpoint
This paper is a presentation of the author's projection of size and design constraints of future containerships. There is a discussion of containers and on-deck container...

An Analysis of Traffic Signal Safety Improvements
Identifying high accident rate locations and determining that they have an overrepresented type or pattern of accidents is an important first step in the safety improvement process. However,...

Risk Assessment: Engineering Tool
In factoring in human-health impacts when tackling an environmental problem, risk assessment is often the best approach. Its use is growing fast. The technique increasingly is being used...

Seismic Restraint of Hazardous Process Piping
The lack of appropriate guidelines for the design and installation of hazardous process piping in industrial facilities has created a potentially dangerous situation. Process piping carrying...

A Recommended Federal Action Plan for Reducing Earthquake Hazards of Existing Buildings
In September 1985 a Five-Year Plan for reducing earthquake hazards of existing buildings was submitted to the Federal Emergency Management Agency. This plan, prepared by the Applied Technology...

Complex Tower Meets Quake Code
A Los Angeles building consists of a triangular 23-story office tower stacked on top of an 11-story rectangular parking garage. The dual-shape is unique in seismically active southern...

The Parking Problem
Corrosion of parking garage decks has become a multi-billion dollar problem, caused primarily by deicing salts that seep into the concrete and attack reinforcing steel. Design and construction...

Berth 5-6 Pavement Performance: Port of Oaklan
In 1978 the Port of Oakland commenced a project to demolish the old Berth 5, 6 & 7 break bulk sheds, portions of the wharves, and the warehouses behind, and to construct container...

Master Plan for Rehabilitation, Modernization and Expansion of the Port of Suez
Rehabilitation and expansion of the Port of Suez, started in 1977, has been an ongoing process for the last eight years and is continuing. As a result of detailed planning of facility...

 

 

 

 

Return to search