A Centrifuge and Analytical Study to Evaluate Suction Caissons for TLP Applications in the Gulf of Mexico
This paper documents the results of a combined centrifuge and analytical study to evaluate the behavior of steel suction caissons under loading and soil conditions typical of deepwater...

Transmitted Swelling Pressures on Retaining Structures
The main objectives of this paper are to describe a finite element model to simulate the lateral swelling behavior of expansive soils as a function of soil suction change in the soil domain...

Advances in Site Characterization
Data Acquisition, Data Management, and Data Interpretation
This proceedings, Advances in Site Characterization: Data Acquisition, Data Management, and Data Interpretation, consists of papers presented...

Finite Element Analysis of Reinforced Concrete Structures II
This proceedings, Finite Element Analysis of Reinforced Concrete Structures, presents papers from an international workshop sponsored by ASCE-ACI...

High Performance Construction Materials and Systems
An Essential Program for America and Its Infrastructure?Technical Report
This report, High Performance Construction Materials and Systems: An Essential Program for America and Its Infrastructure - Technical Report...

Managing Managers
Early in their careers engineers usually begin to manage small groups of people. To learn the necessary skills of management young engineers often imitate their supervisors. This approach...

An Example of Rubble Mound Construction Procedures
The Gold Coast of Queensland, Australia, is in an exposed coastal zone that is now suffering from major problems with both the availability of suitable large rubble armour and its durability...

Pricing Armor Rock for Rubble Mound Breakwaters
The pricing of armor rock by breakwater contractors is an inexact exercise. Each breakwater project is so site specific that standard costing methods are difficult to apply. The wide range...

Quarry Techniques for Dimensional Breakwater Stone
On the Texas Gulf Coast, there has evolved a unique design for breakwater and jetty structures. The Galveston District of the U.S. Army Corps of Engineers, the designer of these structures,...

The Durability of Rubble Mound Armour in Service ? A Case Study
Over the past decade, the ongoing monitoring of Gold Coast rubble mound structures in service has demonstrated a serious loss of durability over a period of time in the rock units after...

RCC for Rehabilitation of Dams in the USA-An Overview
The use of roller-compacted concrete (RCC) has rapidly become a powerful new tool in the USA for engineers involved with the rehabilitation of existing dams. Starting in 1980, RCC has...

Design and Proposed Construction Techniques for Pangue Dam
The paper describes the site conditions, design and proposed construction methods for the 115 m high Pangue Dam, Chile's first RCC dam. Trial mix design work and test embankments...

Roller Compacted Concrete Arch/Gravity Dams?South African Experience
The paper traces the development of roller compacted concrete (RCC) dams in South Africa, and in particular the application to arch/gravity dams. The Department of Water Affairs and Forestry...

A Review of Design Criteria for High RCC Dams
The 1980s could be considered to be the decade during which roller-compacted concrete dams came of age. This economic method of construction is sufficiently proven that very large dams...

Construction of Urugua-I RCC Dam
Considerations concerning the RCC construction process and its relation with the design and quality are analyzed. The paper contains topics related to the experience obtained at Urugua-i...

RCC Dam Design Concepts Versus Construction Conditions for Stagecoach Dam
The Stagecoach RCC dam was constructed using current state-of-the-art knowledge and the geotechnical approach to roller compacted concrete (RCC) mix design. The design was prepared in...

Thermal-Structural Analysis Methods for RCC Dams
Current procedures for evaluating temperature control and the placement of contraction joints in roller compacted concrete dams are not always evaluated with the aid of detailed analysis...

Final Design and Construction of Gibraltar Dam Strengthening
The results of a 1983 safety evaluation of Gibraltar Dam indicated that the dam did not meet seismic safety standards. A remedial scheme involving the addition of a roller compacted concrete...

Laupahoehoe Harbor Planning, Design, & Construction
Laupahoehoe Harbor provides access to the fertile fishing grounds along the northeast or Hamakua coast of the island of Hawaii, Hawaii. The planning, design, and construction of Laupahoehoe...

Numerical Modeling of Proposed Kawaihae Harbor, HI
The Kawaihae shallow-draft harbor site is located on the northwest coast of the island of Hawaii, HI. An entrance channel, turning basin, and breakwater currently exist at the harbor site....

 

 

 

 