Narita Airport People Mover System
This paper gives a general overview of the People Mover installed at the Narita Airport by Otis Elevator in 1992. Included is a description of the unique combination of a cable propelled...
New Opportunities Offered by Cable Systems
After a brief summary of the first cable systems installed in cities, and the fundamental principles which determine their use; the advantages of these systems are addressed compared with...
Cable-Drawn Systems in Shuttle Applications
Cable-drawn Automated People Mover systems have long been regarded as having technology restrictions which often preclude them from being considered for many applications. However, for...
The Challenge of Operating Roped Shuttles on Curved Guideways
Guideway curvature creates design challenges unique to roped people mover systems. These challenges include: Positioning large numbers of rope support sheaves along the guideway to support...
Quality Control: Bridge Steel Fabrication and Erection
This paper examines the Quality Control Program Plan (QCPP) developed by Frederic R. Harris, Inc. (FRH) for fabrication and erection inspection of over 5,448,000 kg of AASHTO Fracture...
Hassle-Free Bridge Rehab
Engineers involved in Cleveland's Main Bridge rehab invoked whatever was necessary to keep area traffic moving and the bridge closure period to a minimum. They helped change...
In Search of Better Load Ratings
Typically, engineers must make a number of subjective assumptions regarding loading and response behavior when they develop a load rating for civil structures. As a result, many unknowns...
LRFD for Timber Structures
The use of load and resistance design (LRFD) methodologies is increasingly becoming the standard analysis procedure for engineering design. The concrete industry has used a variation of...
Lateral Loading Curves from Pressuremeter Tests
The large drilled shafts for the proposed Klamath Falls Bridge, which are to be founded in diatomaceous silts, were to be designed to withstand earthquake induced large cyclic loading....
Bi-Directional Load Testing of Shafts to 6000 Tons
This paper describes the use of Osterberg cells (O-cells) to perform bi-directional load testing on full size production drilled shafts for a major bridge foundation near Owensboro, Kentucky....
Going International: Profit or Peril?
Six veterans of the international engineering and construction market discuss the financial risks of international work, including currency risk; expatriate living conditions; difficulties...
Automated People Movers IV
This proceedings,
Vietnam: Worth Looking Into
If it is to enter the world economy, let alone play catch-up with the booming economies of some of its neighbors, Vietnam requires massive numbers of infrastructure projects: roads, bridges,...
Keeping Cables Calm
Cable vibration and corrosion are potential problems relating to cable-stayed bridges. Nonetheless, owners think their structural elegance is worth it, and increasingly longer cable-stayed...
Arches For A Parkway
The final phase of construction on the Natchez Trace Parkway (which follows a centuries-old 450 mi trail between Natchez, Miss. and Nashville, Tenn.) is nearing completion almost 60 years...
A Dome To Remember
Under intense pressure from all sides, a trio of engineering and architectural firms working in San Antonio, Tex., turned the political coal of a stadium everyone wanted to build (but...
Calendar: Bridges 1994
Featured bridges are: Briggs Bridge (AK); Stone Arch Bridge (NY); Rio Grande Gorge Bridge (NM); Bridge Street Bridge (MI); Hennepin Avenue Bridge (MN); Egypt Pike Bridge (OH); William...
Principles of Holistic Medicine Applied to Infrastructure Maintenance: A Test Case
A humorous consideration of the question of whether holistic medicine�that is, the treatment of the entire physical and emotional configuration of the patient instead of the solely medical...
Learning to Love NDT
Sometimes overblown claims and the practical limitations of early nondestructive tests for concrete have left many civil engineers leery of NDT methods. While some are aware that NDT has...
Dams Going Safely over the Top
Many older dams can't pass updated design floods without overtopping the embankment crest. Conventional upgrade methods, enlarging spillways or raising crests, are expensive....
Return to search