Civil Engineering in the Asia Region
Asian Infrastructure, Sustainable Development and Project Management
This proceedings, Civil Engineering in the Asia Region: Asian Infrastructure, Sustainable Development and Project Management, contains papers...

California and the World Ocean '97
Ocean Resources: An Agenda for the Future
The conference, California and the World Ocean '97 (CWO '97), was organized by the Coastal Zone Foundation and Resources Agency of California. CWO '97...

Seismic Guidelines for Ports
Seismic Guidelines for Ports was prepared by the Ports Committee of the Technical Council on Lifeline Earthquake Engineering of the American...

Shadow Tolls
As federal funding sources shrink, private sector involvement becomes more necessary for road projects. Private entities are reluctant to become partners in road projects unless there...

Making the Grade
A new grade of high performance steel, HPS-70W, allows engineers to design tougher, lighter structures. The high performance weathering steel has a yield strength of 70 ksi, or 485 MPa....

Realizing Engineer-Led Design/Build
While design/build's popularity has grown this decade, the notion that engineers and architects cannot manage the project has remained. Typically heavily capitalized contractors...

Czech It Out (Available only in Structural Engineering Special Issue)
Bridge and transportation engineers and architects combined on the design of a unique bridge in a small city in the Czech Republic. The cable-stayed bridge only has one tower which is...

Casting Hot and Cold
Contractors and engineers battled the Minnesota winter to build a concrete segmental bridge with form travelers. Superstructure segments were poured in temperatures as low as -19F, using...

Rapid Redecking
A contractor replaced nearly 7,000 m� of steel grid roadway deck filled with microsilica concrete on the Canadian crossing of the Thousand Islands bridge system more than one year ahead...

Losing Ground
Unusual engineering approaches, careful studies of earth and water movements, and a multi-organizational project team that worked cooperatively lead to the successful replacement of the...

Light Rail as Planned
The Mission Valley West project, an extension of the San Diego Trolley, runs 6.1 miles between Qualcomm Stadium and the Old Town District. Conceived by the Metropolitan Transit Development...

Urban Runoff Quality Management
This manual comprises a holistic view of urban runoff quality management. For the beginner, who has little previous exposure to urban runoff quality management, the manual covers the entire...

Hydrographic Surveying
This manual establishes criteria and presents policy and guidance for performing hydrographic surveying in support of planning, engineering and design, construction, operation, maintenance,...

Site Safety: Rights, Risks, and Responsibilities
Construction site accidents are all-too-common occurrences that claim lives and cause numerous injuries every year. For accidents that result from unsafe conditions on the site, the question...

Future Fire Codes
Performance-based fire codes are a trend worldwide. The idea is to get away from prescriptive, cook-book codes that dictate design. Performance based codes should be more rational and...

Construction Robots
The Search for New Building Technology in Japan
This book presents Japan's achievements in the development and application of over 100 construction robots and five automated systems. The Japanese have progressed far beyond...

Keeping Tabs on Two Tunnels (available in Geoenvironmental Special Issue only)
Engineers devised a unique liquid level monitoring system to check vertical movements in 90-year old twin subway tunnels. Construction for the Boston Central Artery/Tunnel project requires...

Site Investigations: A Guide (available in Geoenvironmental Special Issue only)
A geotechnical engineer looks at the evolution of reports on subsurface conditions, the most uncertain portion of construction. Most of the cost and risk of construction occurs beneath...

All Decked Out
After 50 years of wear, the deck of New York City's Williamsburg Bridge was buckling and badly in need of replacement. In 1994, consultants recommended replacing the deck...

Making Way for Water
The State Water Project Coastal Branch Aqueduct and Extensions brings 48,000 acre feet of water annually to 23 Southern California communities. built over five years, the project involved...

 

 

 

 

Return to search