Vegetal Protection of Embankments and Spillways
Recent advances in the application of tractive stress to the design of grass-lined open channels are used to develop a tentative procedure for analyzing the hydraulic performance of vegetated...

Predicting and Minimizing Embankment Damage Due to Flood Overtopping
Under a contract with the Federal Highway Administration and Bureau of Reclamation, Simons, Li & Associates, Inc. (SLA) is conducting an overtopping damage study to evaluate various...

Limitations of Saint Venant Equations to Model Flood Waves
The subject of this paper is in direct contrast to all previously known research efforts. Previous effort has focused on simplified forms of Saint Venant using approximate routing models...

Improved Robustness of the NWS DAMBRK Algorithm
The combination dam breach and flood routing numerical model called DAMBRK has been developed by the National Weather Service (NWS) for forecasting river flooding events (Fread, 1984)....

Numerical Model Analysis of Sedimentation Problems at Lock and Dam 1, Red River Waterway
This paper addresses the numerical modeling techniques used to identify the conditions and parameters affecting sediment deposition at Lock and Dam 1. Two-dimensional finite element models...

Effects of Reservoir Regulation on Channel Morphology
A case study is presented in which such a multidisciplinary approach was used to evaluate the impacts of regulated outflows from the recently completed Warm Springs Dam Project (Sonoma...

Modification of Meander Pattern Using Wing Dams
A sharp river bend and a highway bridge together create potentially hazardous conditions for all down-bound barge tows on the Mississippi River at Lansing, Iowa. The tendency of the river...

Roughness Coefficients of Large Floods
Most hydraulic calculations of flow in channels and overbank areas require an evaluation of flow resistance generally expressed as Manning's roughness coefficient, n. Literature...

Floodplain Regulation Downstream of Barrett Dam, CA
Barrett Dam is owned and operated by the City of San Diego, California. The Dam was built in the early 1920's to be an additional source of water for the growing City with...

Lessons from the Failure of a Needle Valve
In 1984 a manually operated, hydraulically actuated 66-inch needle valve ruptured due to water hammer. The circumstances that caused the failure were reconstructed through extensive analysis...

Hydrologic Design Criteria for Dams with Equal Reliability
Appropriateness of design criteria which require using the same Antecedent Moisture Condition (AMC) throughout Kansas for sizing dams and emergency spillways was examined. AMC values which...

California's Dam Safety Program?The Development of Hydrology for Dams (abstract)
California's water code provides for supervision of dams and reservoirs with regard to protection of life and property. This code is administered by the Department of Water...

Operation of Glen Canyon Dam during 1983 and 1984 and the Repairs of Glen Canyon Spillways (abstract)
The gates at Glen Canyon Dam were closed in the spring of 1963 and the reservoir did not fill until the summer of 1980. The spillways were tested in 1980 with only slight evidence of operational...

LFRD Bridge Design as Viewed by the Designer
The load and resistance factor design (LFRD) design concept has been resisted by some bridge engineers on the grounds that it represents a reduction of the 'factor of safety'...

Overview--Committee Report on Dam Safety Guidelines
In November 1984 the Surface Water Hydrology Committee appointed a task committee with the assignment to suggest standards for the hydrologic safety design of dams. The committee report...

Criteria for Spillway Design Floods
The procedures outlined in this paper only address the hydrologic safety criteria for spillway design floods. The recommended procedures are based on a careful identification of the social,...

Indemnification Costs in the Dam Safety Decision
The ASCE Task Committee on Spillway Design Floods has proposed safety criteria for three categories of dams. Category 1 dams are those with anticipated failure consequences so large and...

Utility Programs for DWOPER and DAMBRK
Time and computer resources greatly limit potential investigations and sensitivity anslyses. In order to facilitate modeling with the National Weather Service (NWS) programs DWOPER (Operational...

Safety Design Flood for Too Wide Creek Dam
This paper presents an example application of the procedure developed by the ASCE Task Committee on Spillway Design Floods for a dam on the Too Wide Creek. The example was developed from...

Monte Carlo Approach to Spillway Design Floods
This paper shows the use of a daily stochastic streamflow model for the calculation of the hydrograph for spillway design. Most of the literature related to the topic deals with the problem...

 

 

 

 