The Changing Local Government Role in Permitting OCS Development
The Santa Barbara and Ventura region of California was the location of some of the earliest oil and gas development in the country. Spiraling oil prices, improved technologies and better...
Land-Use Issues Raised by Offshore Oil and Gas Development
While prudent development of offshore energy resources may provide benefit to the nation overall, it invokes several issues for local and regional planning. In particular, petroleum development...
Phased Engineering Development and Multiple Agency Review of Public Safety Issues
Several Santa Barbara County agencies have key engineering review responsibilities for new development. The magnitude of issues raised and the level of engineering review required for...
Risks of Transporting Petroleum and Other Materials from Offshore Oil and Gas Development
Oil and gas development offshore Santa Barbara County has lead to the preparation and adoption of local policies and mitigation programs specifically addressing the risks associated with...
Monitoring and Mitigating the Socioeconomic Impacts of Coastal Oil and Gas Development
Santa Barbara County has required that all companies engaged in major offshore oil and gas projects participate in a Socioeconomic Monitoring and Mitigation Program (SEMP). Yearly impact...
Risk Assessment & Engineered Organisms in Remediation
With the explosive growth of biotechnology, it is likely that bioremediation efforts can be significantly enhanced by employing genetically altered organisms. Before the actual introduction...
Case Studies of POTW Air Toxic Emission Tests and a Proposed Emission Control Strategy
Air toxic emissions and associated human health risk at wastewater treatment plants can be reduced with a phased implementation strategy. An evaluation of major conventional secondary...
Epidemiology and Toxicology in Engineering Education
The Accreditation Board for Engineering and Technology, Inc. (ABET) first articulated an interest in providing undergraduate engineers with background in occupational health and safety...
Redevelopment of Remediated Superfund Sites: Problems with Current Approaches in Providing Long-Term Public Health Protection
The normal primary objective of Superfund site remediation is the control of hazardous chemicals so that they do not represent a significant threat to public health and the environment...
Performance Analysis of Remedial Alternatives
This paper demonstrates how remedial action alternatives for a Superfund site can be evaluated using a health-risk basis. The case history for this demonstration is a Feasibility Study...
The Ozone Layer: A Critical Analysis of the Management of Public Policy for Fluorocarbons
As environmental public policy becomes increasingly extensive it continues to have greater impact on the lives of each American. The management of the public policy formation process varies...
Numerous releases of hazardous substances have occurred at uncontrolled sites all around the United States. These sites pose toxic threats to public health and our environment, and potential...
Environmental Protection, Resource Allocation and CERCLA: A Practitioners Perspective
In accepting Superfund's mandate of protection of human health and the environment in a timely manner, critics often overlook, the limited human, technical and material resources...
C.t. Disinfection Practices in Open Chlorine Contact Basins
Susequent to an increased incidence of giadiasis in the coomunity in 1982 it became evident that Westpac had to improve its disinfection process and its ability to determine their effectiveness....
California Standards for Characterizing Contamination and Assessing Risk from Hazardous Waste Sites
The Toxic Substances Control Program (TSCP) of the Department of Health Services is responsible for managing California's hazardous waste program. A primary goal of TSCP is...
The Impact of No Net Loss of Wetlands on Water Power Development Alternatives
Federal commitment to wetlands protection is increasing. The Bush Administration has embraced an as yet undefined goal of 'no net loss of wetlands' and various...
Extensive Civil Penalties Apply?Lessons Learned Since Waterpower '89
Section 12 of ECPA authorized the FERC to assess civil penalties in enforcing Part I of the Federal Power Act and its implementing regulations, as well as the terms and conditions of hydropower...
Development of Small Hydro in Ontario
Ontario is Canada's most populous Province with approximately 10 million residents, representing 40 per cent of the country's population. The electricity needs...
Private Hydropower Projects: Exporting the American Experience
This paper addresses different aspects of exporting the American knowledge and experience in the private development of small-scale hydropower projects. It details the 'export'...
Brule Hydroelectric Project Inflow Design Flood Study
In 1987, Wisconsin Electric Power Company (WE) was directed by FERC to provide additional spillway capacity at it's 63-foot (19 m) high Brule Dam. Original spillway capacity...
Return to search