A Goal Driven Approach to Discrete Event Simulation
Discrete event simulation is getting more attention as a tool for allocating construction resources. However, its usage is limited because it requires intensive knowledge in conducting...

A New Automated System for Decision Support in the Construction Industry
This paper describes a collaborative project to research and develop a computer based decision support system for the construction industry. The system is intended primarily for use during...

Using CADD Application to Support Construction Activities
This paper discusses how electronic CADD submittals from designers can be transformed into a format appropriate for construction planning and management. Currently, design drawings are...

3D CAD Modeling and Graphical Simulation of Mobile Cranes
This paper describes the research performed to lay a foundation for developing a graphical simulation system which can be used in the planning of heavy lifts using mobile cranes. Mobile...

A Frame-Based Drawing Management System Based on Building Object Model
This paper presents current research issues on management of information and knowledge utilized in product design process based on building object model concept. The objective of research...

Multimedia Technologies for Civil and Construction Engineering Professional Practice
Multimedia can be classified as any experience or application that uses two or more media to convey a message or achieve a given purpose. Some of the main types of possible applications...

Strengthening the Design/Construction Interface Using Electronic Imaging, Document Management and Work Flow Technologies
The paper describes a conceptual approach for the implementation of document imaging systems as a mechanism for strengthening the design/construction interface. The paper discusses some...

Applying Multimedia Technology to Project Control
Construction project control and documentation require an accurate, complete, and efficient way of collecting, storing, and retrieving project information. This information contains construction...

Capturing As-built Project Information for Facility Management
Complete, accurate, and timely provision of as-built information plays a critical role in the optimal upkeep of a facility. Facility operators/maintainers usually are delivered a constructed...

A Decision Support System for the Expansion of International Operations of A/E/C Firms
The changing trend of the construction industry will require A/E/C firms to consider expanding operations in the international construction market arena. This paper presents a conceptual...

An Integrated Computer Model for Project Schedule Updating
Current schedule updating techniques rely mainly on field reports to specify completed work. Information provided in these reports are then manually summarized, analyzed, and input to...

Overlaying Digital Images with 3-D CAD to Document as Built Construction
A persistent problem in construction has been documenting changes which occur in the field and preparing as-built drawings. The accuracy and completeness of field measurements is often...

Graphic Visualization for Planning Heavy Lifts
The application of graphical visualization to construction can serve a wide variety of objectives and offers many significant benefits. Heavy lifts are an important component of industrial...

Building Product Model, A First Brick in Computer Integrated Construction
This paper describes the development of a product model as a basis for an information system. This new approach is based on modelling functions of building units rather than physical entities...

Developments to the IRMA Model of AEC Projects
The rapidly advancing fields of information technologies (IT) for AEC and computer-integrated construction (CIC) rely on the ability to represent and exchange information about AEC projects...

Information Modeling and Applications
The objective of this paper is to describe events and findings in the development of a comprehensive information architecture for a building. The information architecture has a goal of...

Machine learning Applications for Automated Constructability Reviews
Knowledge acquisition of the project design and construction site conditions is essential for determining construction project complexity. An effective knowledge acquisition method is...

Time-related Deflections of Cantilever Bridges
Many prestressed concrete bridges with spans between 100 and 160 m have been built in the Netherlands. The method of construction is the so-called in situ free cantilever construction....

An Artificial Neural Network Approach to Allocating Construction Resources
This paper presents an approach to alleviate the problem of depending upon human expert in allocating construction resources. This approach is using artificial neural networks to capture...

SELECTCRANE: An Expert System for Optimum Crane Selection
Every major project undertaken today requires the services of a crane(s) to ensure that all materials and equipment hoisting and placement are performed in the most efficient manner. The...

 

 

 

 