Project Cost Control for Heavy Equipment
Some concepts and methods of project cost control for heavy equipment have been defined, which include methods, effectiveness, outside repairs, and the resulting management information,...

Financial Development for Projects
An important element in the total package of Bechtel's engineering and construction services is the financing and commercial assistance offered in support of our client's...

Total Cost Purchase Options Buy vs Lease vs Rental Conversion Cash Flow Analysis
Today's financing alternatives are very complex and sometimes difficult to comprehend. The combined effect of the slow economy and uncertain future workload has accelerated...

Financial Statement Impact of the Rent/Lease/Buy Decision for Contractors using Heavy Equipment
Contractors with substantial equipment requirements must carefully weigh all of the quantitative and qualitative factors related to how they finance their equipment. Certain of these factors...

Low Level Artificial Intelligence and Computer Simulation to Plan and Control Earthmoving Operations
This paper describes an advanced computerized method for designing an optimized earth distribution plan for a linear earthmoving project. Modeling and computerized simulation offer a quantitative...

Teaching Experiment in Real-Time Construction Data Acquisition
This paper describes an experiment used in an undergraduate civil engineering course to familiarize students with interfacing electronic instruments mounted on a construction machine to...

Rapid Assessment of Seismic Vulnerability
The choice of a seismic damage assessment method depends fundamentally on how the assessment will be used, but always involves definition of the expected ground motion and the structure...

ATC Methodology and Data for Rapid Assessment of Seismic Vulnerability
Recently developed Applied Technology Council (ATC) methodology and data provide a technical basis for rapid assessment of structure seismic vulnerability. Methodology developed under...

Techniques for Estimating Earthquake Probable Loss for Buildings and Contents
The probable maximum loss (PML) is useful for quantifing the seismic risk exposure of a facility and for rational decision making regarding earthquake insurance and seismic strengthening...

Rapid Identification of High Risk Building in Seismic Regions Using Expert Systems
Seismic risk evaluation is a complex problem because it involves many factors such as ground motion, ground failure potential and structural performance with great uncertainties. Many...

Seismic Risk Analysis of a Multi-Site Portfolio of Buildings
A discussion of a methodology that permits the assessment of the seismic risk associated with a group of buildings and incorporates relevant aspects of seismic hazard assessment including...

The Promise of Supercomputers
This paper briefly reviews the classification and general architecture of supercomputers: their capabilities, promise, current and projected limitations are considered. The author reviews...

Lessons Learned from Design, Construction, and Performance of Hydraulic Structures
The intent of this publication is to provide lessons learned, both positive and negative, from activities associated with design, construction, and performance of hydraulic structures....

Environmental Engineering
Over 80 of the papers presented at the 1986 National Convention on Environmental Engineering are included in this book. The major categories covered include air, noise, and radiation management,...

Managing Two Projects as One
The Port of Tacoma completed a new two berth container terminal and intermodal yard for Sea-Land in May 1985, only 26 months after signing a binding agreement. The project, which also...

Infrastructure in a Hurry
The City of Austin, Texas has experienced tremendous growth since the early 1970s. Until recently, however, infrastructure development lagged. Now the city is engaged in a $1 billion infrastructure...

Going Afield with Instrumentation
An overview of field measurements and instrumentation in civil engineering is presented. System components are described for the practicing design or construction engineer involved in...

Instant Hydro Forecasting
Two new software programs developed by a San Francisco-based engineering firm determine hydropower potential, best site configuration, and best economics for hydroelectric projects. One...

Structural Optimization Under Conditions of Uncertainty, with Reference to Serviceability and Ultimate Limit States
Probability concepts and methods are rapidly gaining ground in the search for more rational approaches to structural optimization. Under conditions of uncertainty, the risk of unfavorable...

Water Project Design and Safety: Prospects for Use of Risk Analysis in Public Sector Organizations
After offering some initial definitions, the authors will describe a highly structured model of risk analysis and water resources decision making in the public sector. The primary emphasis...

 

 

 

 

Return to search