Advanced Microcomputer Simulation for Construction Managers
The concept of simulation allows the analysis of complex and dynamic systems such as those encountered in construction operations. In particular, the technology orientation of construction...

Microcomputer Expert Systems for Welded Construction
Stone & Webster Engineering Corporation has developed expert systems including various applications within the field of welded construction. Systems have been developed in the...

Commercially Available Workstation Networks
Twelve commercially available local area networks are compared, transmitting variously over optical fiber, twisted pair and cable. Throughput, tunability, cost and ease of use are discussed,...

The Engineering Workstation at Skidmore, Owings & Merrill
The computer group at Skidmore, Owings & Merrill has developed a unique workstation environment which aids both the generation of information in the design phase, as well as the...

A Method for Computerized Site Characterization
Site characterization, the process of evaluating subsurface soil, rock, and groundwater conditions and their impact on project design and construction is a common element in every major...

Computers in Structural Engineering Practice The Issue of Quality
The dilemma of affordable and easy access to computing versus uncertain and dangerous pitfalls will be a continuing one for the profession. Since the pitfalls include problems associate...

Personal Computer Environment for Minicomputer Users
Users find that personal computers can perform most functions previously available only on minicomputers or even mainframe computers. Companies have an imbedded investment in existing...

Selection of Computer System
To buy a system is a major decision undertaken by the user. It has major impact on the financial and the manpower aspect of the company. To enable the user to arrive at a rational decision,...

Finite Element Analysis of Structural Details in Large Steel Bridge Superstructures
Various approaches for the finite element modeling of the connection details in large steel bridge superstructures are presented. It is noted that an accurate analysis of these details...

Computer Simulation of the Overload Behavior of Steel Multigirder Bridges with Cracked Girders
Various approaches of determining the structural response of steel multigirder bridges with cracked girders are presented. It is noted that linear finite element packages with three dimensional...

Groundwater Modeling: Selection of Computing Systems
Results are presented for ten microcomputer systems evaluated with respect to system performance in solving a test case three-dimensional groundwater flow problem. The model used was the...

Facing Failures: Alleged or Actual
Every practitioner, in a large or small office, faces the possibility of an accusation of causing, directly or indirectly, a failure. The resulting embarrassment, frustration, regret,...

Failures: Who Did It - How Did It Happen?
The forensic engineer investigates the cause of failures and determines, from an engineering viewpoint, who was responsible for that failure. These failures need not be catastrophic but...

How Do I Find the Information I Needed Yesterday?
One reason that the professional has not been more effective in learning from failures is that the information disseminated has not always reached the right people. The Architecture and...

Avoiding Failures Caused by Lack of Management
Engineering failure often results from administrative or managerial failure. In addition to providing sound engineering or technical services, we have a responsibility to administer and...

Computer Use in Structural Analysis
Acquisition of computer hardware and software in order to establish distributed processing and a local area network at the Air Force Weapons Lab has greatly streamlined two structural...

Designing People Places
Designing people places on the waterfront relies on first satisfying people's needs. The needs of people in public places (both on and off the waterfront) include at least...

Waterfront Development: Getting It Started?The Public Sector Role
In comparison with other forms of urban development - by almost any measure you wish to choose - the waterfront is the most difficult and complex area to develop. Despite all of the obstacles,...

Solving Complex Urban Design Problems
Waterfront redevelopment projects under construction today should be a designer's dream. They offer an opportunity to apply a unified, large-scale vision to unusually large...

Norfolk, Virginia Case Study
Through decades of hard work at revitalization, Norfolk has learned from its experience - success and failures. Perhaps the best lesson learned comes from the success of waterfront development...

 

 

 

 

Return to search