Sustaining Urban Water Resources in the 21st Century
This proceedings,
Holding the Advantage
Small firms are constantly under a number of business pressures, and competing for qualified engineers with both large and small engineering firms is just one more challenge to contend...
The Train to the Plane
Getting to New York's John F. Kennedy Airport is an urban nightmare. The Port Authority (PA) of New York and New Jersey, which operates the airport, has wrestled with proposals...
Enduring Elegance (Available in Structural Engineering Special Issue only)
Every architect who designs for earthquake-prone areas wants to create an elegant aesthetic form despite the limitations of seismic considerations. The San Francisco International Airport's...
Towering Over Xiamen (Available in Structural Engineering Special Issue only)
Composite structural systems are rapidly becoming the preferred choice for high-rise buildings, due to their high strength and stiffness, large ductility, and convenient, economical construction....
Environmental Engineering '99
This proceedings,
Evaluation of the ISOGRID Retaining Wall System
Prepared by the Highway Innovative Technology Evaluation Center, a CERF service center. This report presents the results of a HITEC evaluation of the...
GIS Modules and Distributed Models of the Watershed
Prepared by the Task Committee on GIS Modules and Distributed Models of the Watershed of ASCE. This report guides professionals in selecting the mostadvantageous...
Conquering the Cold
Three projects�a water treatment plant, an airport, and a hydroelectric plant�illustrate how practicing engineering in Alaska differs from working in the contiguous 48 states. Permafrost,...
The Arch Bridge Mystery
For some years, concrete from the Manayunk Bridge�a long-idle, spandrel-arch railroad bridge in Philadelphia�had been spalling toward the streets and river below. While a system of nets...
A Joint Effort
In a public-private partnership that required close working relationships, a project that aimed to restore an old canal system� and its waterfront�in Richmond was combined with an effort...
CSO Controversy
Under the Environmental Protection Agency's (EPA's) national combined sewer overflow (CSO) policy, more than 900 cities will no longer be able to discharge untreated...
Pipeline Safety, Reliability, and Rehabilitation
This proceedings,
Who Provides Inspection
With the increasing interest in the design-build project deliver system, the decision of who should be responsible for quality assurance/quality control has become a complex one. To assist...
Optimizing Post-Earthquake Lifeline System Reliability
This proceedings,
High-Tech Highway
The Virginia Dept. of Transportation has spent more than $30 million on the first 2 miles (3.2 km) of the planned 5.7 mile (9.2 km) Smart Road near Roanoke, Virginia. Eventually the road...
Newsletters That Deliver
A newsletter consultant and business manager for a small engineering firm explains how to create an effective newsletter for new and potential clients. Among the necessary steps are establishing...
Tall Order
Successive earthquakes have damaged the 32-story, 460 ft (140 m) tall Los Angeles City Hall, built in 1926. Masonry infill and concrete walls have cracked, and the terra cotta cladding...
Back from the Brink
The Cape Hatteras Lighthouse, the tallest brick lighthouse in the United States, has been moved to prevent it from toppling into the sea as a result of coastal erosion. Engineers from...
Managing the Megaproject
The Mon/Fayette Expressway and Southern Beltway will link Pittsburgh, Pennsylvania and Morgantown, West Virginia via a 104 km, $3.5 billion Y-shaped highway. With the project split into...
Return to search