Application of Water Budget to Seepage Loss Estimation
The seepage loss for the emergency cooling water spray pond has been calculated by performing a water balance study for the pond. A field test of the spray pond was performed to estimate...

Simulation of Far-Field Thermal Effects from Browns Ferry Nuclear Plant
A computer model was used to evaluate the far-field effects of revised thermal discharge limitations at the Tennessee Valley Authority's Browns Ferry Nuclear Plant (BFN)....

Computer Simulation of Coagulation
Coagulation, the process of collision and coalescence of particles, modifies the size distribution of the suspended mass, continuously creating larger particles which may settle out of...

Particle Sizes in Flocculation and Sedimentation: Models and Experiments
D. F. Lawler et al. developed a model for flocculation, sedimentation, and filtration and predicted the effects of particle size distribution and concentration of the influent in water...

Hydrothermal Model Study of Stratified Flow in a Power Plant Cooling Water Recycle/Intake Canal: Reynolds and Densimetric Froude Number Effects
During the winter of 1983-1984, the control of frazil ice at the trash tracks using pneumatic air guns was evaluated at Danskammer Point Generating Station. This paper presents a brief...

Frazil Ice Control Using Air Guns
The design of the J. H. Campbell, Unit 3, Cooling Water Intake in the late 1970's used some new ideas and concepts in response to a strong concern for fish protection at a...

Make-up and Blowdown of a Cooling Pond
A mathematical model was developed to simulate the operation of a recirculating cooling pond for a planned nuclear power plant in the Midwest. The objective of the pond operation is to...

Guideway and Conductor Rail Heating for a Winter Environment
The power and signal conducting rails are maintained using self-limiting heat trace cable in combination with an inherently protected rail. The cable's high inrush power along...

Girth Weld Defect Tolerance Criteria
This paper describes the following criteria proposed for setting allowable defect sizes in girth welds: PD 6493:1980, 'Guidance on Some Methods for the Derivation of Acceptance...

A Summary of the Seismic Qualification Utilities Group (SQUG) Program
In December of 1980, the Nuclear Regulatory Commission (NRC) initiated Unresolved Safety Issue (USI) A-46 to address the question of the seismic adequacy of equipment in 49 operating nuclear...

Seismic Design-Qualification of Non-Safety Related Items in Safety Related Envelope
This presentation pertains to Seismic Design-Qualification for those portions of structures, systems, or components in a Nuclear Plant whose continued function is not required but whose...

Particles, Pretreatment, and Performance in Water Filtration
Relationships among raw water quality, pretreatment facilities, and the design of packed bed filters are presented and applied. The particle size, particle concentration, particle surface...

Strength of Soils in Terms of Effective Stress
The factors that determine soil strength, such as amount of confinement, density, particle size distribution, mineral friction, aging, particle crushing, and others, produce their effects...

Seismic Experience Data?Nuclear and Other Plants
The Seismic Qualification Utilities Group (SQUG) was formed to explore the use of earthquake experience data of equipment performance to resolve Nuclear Regulatory Commission (NRC) initiated...

Thermal Design Considerations in Frozen Ground Engineering
Prepared by the Technical Council on Cold Regions Engineering of ASCE. The design of engineering projects in frozen ground requires thermal design considerations...

Richart Commemorative Lectures
The geotechnical specialty known as soil dynamics has developed during the past 25 years from a minor role to a mainstream discipline. Professor F. E. Richart has played a major role in...

Pipe Laying Comes Out of the Trenches
Recent developments have shown that trenchless construction offers an effective and economically attractive alternative to conventional excavation. These findings are especially important...

Seismic Considerations for the Century Freeway
The Century freeway (Interstate 105), will be an 18 mile (29 km) long, six-lane facility with 2 central transit/HOV lanes, located in Los Angeles, California. The freeway alignment crosses...

Base Isolation Concepts for Seismic Bridge Retrofit
Failures in past earthquakes have indicated three major problem areas with existing bridges. The first is the vulnerability of existing rocker and roller type bearings and this is coupled...

Seismic Risk and Decision Analysis of Lifeline Systems
This paper provides general guidelines for performing lifeline seismic risk and decision analyses. Relevant input models are introduced as they support the performance of component and...

 

 

 

 

Return to search