New Deep Foundations Cut Costs
Two European innovations in deep foundations are highly competitive in cost, time and material. They are the barrette (slurry wall segment) and the bored pile/caisson which is then grouted...
Another Geotech Import: Deep Soil Mixing
A technique called deep soil mixing (DSM), imported from Japan, has been used to stabilize an existing dam foundation. When the Bureau of Reclamation discovered that Jackson Lake Dam had...
Finite Element Idealization for Linear Elastic, Static, and Dynamic Analysis of Structures in Engineering Practice
This report by the Finite Element Idealization Task Committee is a comprehensive aid for modeling structures for finite element analysis. The first part covers static analysis. Aspects...
The Pelican, Alaska Hydroelectric Station
In August 1983 Pelican Cold Storage directed KPL to install a new 600 kW turbine, synchronous generator, controls and penstock transition section. This new equipment was to fit upon the...
Piedra Del Aguila�New Hydropower for Argentina
Construction commenced in early 1985 on the 1. 0 billion Piedra del Aguila Hydroelectric Project on the Rio Limay about 1200 km (750 mi) southwest of Buenos Aires, Argentina. The project...
Sherman Island Hydro Cofferdam
The design and construction of an eight hundred foot long by sixty-five foot high cofferdam is discussed. The cofferdam was located to permit major renovation of the existing downstream...
Evaluation of Liquefaction Potential of Anderson Ranch Dam
This paper contains a description of a liquefaction evaluation of the alluvial foundation soils at Anderson Ranch Dam, which was performed as part of the USBR's program of...
Thermal Monitoring of Leakage Through Dams
The technique involves very accurate temperature measurement at shallow depth below the reach of the surface diurnal cycle. Temperatures respond to subsurface water movement (with advective...
Dynamic Analysis of Existing Tarbela Intake Towers
According to general practice at the time of the design, the pseudostatic method of applying earthquake loading was used. The basic acceleration was 0. 1g. A post-construction seismological...
Design of Drilled Piers Subjected to High Overturning Moments
The results are presented of a research study directed at improving the state-of-practice, and resulting foundation economy, in the design of laterally loaded drilled pier foundations...
IEEE/ASCE TransmissionStructure Foundation Design Guide
The American Society of Civil Engineers' (ASCE) Subcommittee on Foundation Design for High-Voltage Transmission Structures was formed in October 1976. The purpose of the Subcommittee...
Special Pile Foundations for a Coastal Permafrost Site
The design of the plant's foundations had to address several challenging geotechnical conditions. These included (1) 'warm' (close to 32 degree F)...
Building Foundation on Thawed Soil and Permafrost
The site of a planned 10,000 square foot State Youth Facility in Bethel, Alaska was found to be underlain by discontinuous permafrost. This paper describes the geophysical and geotechnical...
35-Year-Old Foundations, Thule Air Base, Greenland
In February 1951 the secret project 'Blue Jay' to construct the base began. Timber piling were used in the foundations of boilers, generators, and other heavy...
Design and Monitoring of an Ice Drill Pad
An ice pad was sucessfully designed and built to provide a suitable foundation for an exploratory drill rig in the National Petroleum Reserve of Alaska in early 1985. Design considerations...
A Self-Refrigerated Gravel Pad Foundation for Large Thermal Loads
Design criteria for a proposed power plant at Thule Air Force Base, Greenland, involved both large thermal loads from the diesel engines and large static loads from an eight foot thick...
An Economical Approach to Receiving Coal by Rail in the Sub-Arctic Environment
During the period 1983 to early 1985 a multimillion dollar coal transfer facility was designed and constructed in Seward, Alaska. The facility transfers coal from rail cars to temporary...
Long Term Performance of the Goldstream Creek Bridge
In 1964 the Alaska Department of Transportation and the U. S. Army Cold Regions Research and Engineering Laboratory initiated a cooperative study which in the long-term generated a significant...
F.E.M. Analysis of Mobile Arctic Caisson Island With Stochastic Material Properties
The paper examines how soil uncertainty influences the short term settlements and stresses of the Mobile Arctic Caisson on the original sea bed. Utilizing a two-dimensional plane strain...
Geotechnical investigation: Cominco's Red Dog Mine Facilities
The siting of major facilities associated with development of the Red Dog Mine Complex in Northwestern Alaska on relatively warm permafrost soil and rock presented geotechnical engineers...