Design Data of Pump-Turbine and Francis Turbine Units
Some basic statistical data covering geometrical and energy parameters for Francis turbine and Pump-turbine units are presented. These data are further compared as specific ratios for...

Selection of Turbine Diameter and Speed for Francis, Kaplan, and Pelton Hydraulic Turbines
This paper is a continuation of work presented at WATERPOWER '83 and presents up-to-date information on the selection of diameter and speed for Francis, Kaplan, and Pelton...

Turbine Efficiency Monitoring Utilizing Ultrasonic Flowrate Measurement
On-line turbine efficiency measurement can be achieved by ultrasonic flowrate measurement and state-of-the-art data acquisition techniques. A field performance test program conducted at...

Field Testing: Producing Complete Test Results on Site, A Realistic Objective
Modern technologies and instruments have had an influence in nearly every field imaginable. At Hydro-Quebec, the last ten years have brought about a complete transformation in the way...

Hydro Machinery Problem Solving Experiences
Within the last decade the use of modern data acquisition instrumentation and techniques have moved the subject of the machinery problem solving into a more scientific arena. This paper...

Index Testing With a Data Acquisition and Control System
A computer controlled index test has been developed that can be used to optimize blade-gate relationships on adjustable blade (Kaplan) hydraulic turbines. This paper includes hardware...

Basic Considerations in Governed or Non-Governed Small Hydro Power Plants
This paper reviews the necessary studies and major considerations that must be completed for proper coordination and selection of a turbine governor, and generator. A discussion of the...

Grand Coulee SCADA System Procurement
Purchasing a quality Supervisory Control and Data Acquisition (SCADA) or Energy Control System (ECS) at a reasonable price for a particular installation can be a challenging undertaking....

Kaplan Blade Angle Controller
This paper describes a recently developed computerized Kaplan blade angle controller that is capable of improving turbine performance. Model Tests or Index Tests produce the Three-D-Cam...

Capabilities of Automated Control System Employing Advanced Programmable Controllers
This paper details Voith Hydro's range of experience in the use of Programmable Logic Controllers (P. L. C. 's) in the automation of new hydro electric sites....

Integrated Automatic Hydroelectric Plant Control
The increased acceptance and employment of microcomputers to control specific functions in small hydroelectric plants has led to computerized integrated total control of hydropower generation....

Accelerated Life Testing of Generator Coils
This paper presents a step-by-step procedure for doing a 400 hour, 60 Hz, 90 degree C accelerated life test on generator coils. Test procedure is as follows: 1. Initial coil examination...

Subsidence Over AML and Its Causes?A Case Study
Subsidence over abandoned mined lands can be attributed to several causes. For purposes of compensation and liability and developing remedial measures, it is essential to identify the...

Recent Thoughts on Probabilistic Fatigue Crack Growth
We briefly review recent results of analysis of fatigue crack growth data. Implications of this analysis are presented, and reasons are advanced in favor of increasing the dimension of...

Statistics of Concrete Shrinkage Test Data
The paper reports a large series of concrete shrinkage tests which can be used for statistical purposes. The series involves two groups of 36 identical cylindrical specimens, with a diameter...

Reliability of Geotechnical Systems Considering Geological Anomaly
Anomaly statistics at a given site are first assessed through Bayesian methodology on the basis of site exploration data. Several methods may be then used to incorporate the anomaly uncertainties...

Statistical Analysis of Occupant Dynamic Loads
Human-induced load-time histories were modeled by several dependent descriptive parameters. These parameters were treated as functions of two independent variables in a multivariate regression...

Design Wind Loads for Broadcasting Antennas from Short Time Records
Very useful would be procedures for the determination of the design wind load on the basis of short time records, of duration comparable with the preliminary and/or design phases, so that...

Approximate Reasoning in Engineering Decision Analysis
In this paper, the concept and methods of approximate reasoning are reviewed and discussed. The methodology of combining precise results of exact analysis, approximate solutions of exact...

Using the Microcomputer in the Software Development Process
The migration of the computer from the controlled environment of a computer room to the office desk-top provides the software engineer with a convenient and effective tool for enhancing...

 

 

 

 

Return to search