Quantifying the Maximum Capability of Hydroplants
A procedure was developed to quantify the maximum hydropower capability. This procedure basically consists of two steps: dividing the total available water into weekday and weekend components;...
Water Availability for Energy Development in the Upper Colorado River Basin
The Bureau of Reclamation is investigating, for planning purposes through hydrologic determination, the total allowable depletion level in the Upper Colorado River Basin. The Colorado...
Computer Modeling for a Power Intake
This paper describes the application of an existing computer model to respond to environmental requirements for a small scale hydroelectric power plant being developed by Allegheny Electric...
U.S./PRC Cooperation on the Three Gorge Project
The Three Gorge Project is the keystone project in developing and using the Yangtze River. It is located on the main stem of the Yangtze River, about 40 km upstream from the Gezhouba Project...
Special Pile Foundations for a Coastal Permafrost Site
The design of the plant's foundations had to address several challenging geotechnical conditions. These included (1) 'warm' (close to 32 degree F)...
Adfreeze Strength of Ice to Steel Pipe Piles as a Function of Temperature
A study was initiated to determine the adfreeze bond strength between steel pipe piles and freshwater ice as a function of temperature. Tests were conducted at an average strain rate of...
Hot Sand for Improved Traction on Icy Roads
Experiments were performed to determine if heating sand prior to spreading it on icy roads would improve the skid resistance of the road more than cold sanding. Tests were made on a full-scale...
Stabilization of a Permafrost Subsidence in the Airport Runway at Bethel Alaska
During the construction of the extension to the Bethel Airport runway in 1969, it was necessary to construct a fill across a small gully. The subbase material in the gully contained some...
A Laboratory Study of Factors Affecting Wetted Snow Roads
A brief review of the the literature concerning the application of water to the surface of snow roads is presented. It is demonstrated that there is no general agreement on the proper...
Design and Monitoring of an Ice Drill Pad
An ice pad was sucessfully designed and built to provide a suitable foundation for an exploratory drill rig in the National Petroleum Reserve of Alaska in early 1985. Design considerations...
Development of a Self-Heating Thermal Probe for Saline Permafrost
Geothermal modelling and prototype testing are described to support the development of a self-heating thermal probe. This has application for in-situ determination of the amount of unfrozen...
Installation of Thermistor Strings in Test Borings: A Comparison of Methods and Results
Several test borings were instrumented with two thermistor strings, one inside and one outside an air-filled PVC casing to compare readings of both thermistor strings and the stability...
Monitoring Techniques for Thermosyphons
Two-phase thermosyphons used for passive soil refrigeration are monitored using a variety of techniques ranging from visual infrared scanning to measurement of internal pressures. Methods...
Ground Temperature Monitoring Cominco's Red Dog Project
Procedures are available in the literature for estimating subsurface thermal characteristics of foundation soils in cold regions using published climatic characteristics for a given area....
Cold Regions Features of the Whittier Access Tunnel
A feasibility study and cost estimate has been prepared for a vehicular tunnel which would form a portion of a highway between the town of Whittier, Alaska and the east side of the Kenai...
A Thermal Analysis of Pavement Thawing
This research focuses on identifying the spring thawing period for the purpose of timing load restrictions on low to medium volume roads in frost-susceptible areas. Cases evaluated include...
Anchorage Taps Eklutna Lake for New Water Supply
The 170 million Eklutna Water Project will furnish water to Anchorage, Alaska by the summer of 1988. The project consists of an 8,500-foot long diversion tunnel, 6 miles of 54 to 60-inch...
An Overview of Cold Region Considerations for the Design of the Eklutna Water Project
The paper presents a brief overview of cold regions considerations that were considered during the design of the various elements of the Eklutna Water Project in Anchorage, Alaska. The...
Water Treatment Facility Design for a Glacial Lake
The Municipality of Anchorage, Alaska has undertaken a major water supply project, the Eklutna Water Project, to satisfy the growing water demands of Anchorage. The source of raw water,...
Evaluation of Sewage Treatment Requirements in Cold Regions: Case Study?City of Whitehorse
This paper describes a method available for evaluating sewage treatment requirements in cold regions. The City of Whitehorse wastewater management situation has been used as an example...