Cost Engineering for Disputed Work
Engineers and architects tend to underestimate the cost of disputed work, especially those connected with delay. The engineer, using industry standards and estimating rules of thumb, can...

Drainage Tunnels Save Freeway Link
A 15 mile section through downtown Phoenix will complete Interstate 10. After years of delay, the project is now close to completion. The project required construction of 6.5 miles of...

Small Water Users�Planning Crisis
Planning to rehabilitate small water systems�both irrigation and municipal water supply�often is ignored. In contrast, planning for new construction and for operations/maintenance work...

Decision Support System for Tunneling
This paper first discusses methodologies for considering geological uncertainty in tunneling projects and for determining the most economic excavation and support methods under such condition;...

Soft Ground Tunneling of the Greenbelt Tunnels
Mergentime/Loram's contract for the construction of Section E-1d Greenbelt Route Tunnels includes construction of dual 1,770-foot tunnels in soft ground, a crossover structure,...

Construction Inspection?The Last Line of Defense
Construction inspection, or a quality assurance program, is typically the last line of defense in relation to claims for the constructed project. The quality assurance team should be a...

A Systematic Approach to Evaluating the Risk of Contractual Disputes
Construction contract disputes along with A/E malpractice actions have raised much concern in the industry. Considerable literature has been written along the lines of claims avoidance...

Investigation of Catastrophic Failure of a Premium-Alloy Railroad Rail
In November 1983 an Amtrak train derailed at a speed of 72 mph (115 kph) at Woodlawn, Texas (in the vicinity of Marshall, Texas), resulting in four fatalities and twenty-four serious injuries....

Forecasting the Demand for Electricity: An Examination of Alternative Approaches
This paper examines several approaches to forecasting national-level electricity demand. The various approaches are briefly examined, and the strengths and weaknesses of each are discussed....

The Role of Demand Forecasts in Pacific Northwest Power Planning
This paper has two primary objectives: to acquaint a general audience with the basic approaches used to forecast the demand for electricity, and to discuss the role of demand forecasts...

The Impact of Demand-Side Management on Load Growth: Some Tentative Results
Demand-Side Management (DSM) programs including load management, conservation and strategic load growth are being implemented by a very large number of utilities for the mutual benefit...

New Safety for Old Dams
Shortly after the Phase I inspection program conducted by the U.S. Army Corps of Engineers in 1978-81, the Pennsylvania legislature authorized $300 million for repair of dams, ports and...

Construction Cost Control
The second edition of Construction Cost Control, the first revision in thirty-three years, has been updated to provide engineers and contractors...

Development and Management Aspects of Irrigation and Drainage Systems
The 1985 Irrigation and Drainage Division Specialty Conference held in San Antonio, Texas on July 17-19, 1985 covered major topics on watershed management and water conveyance, drainage...

Computer Applications in Water Resources
The use of computers in all engineering disciplines has, in the past decade, increased to the point where virtually all engineers now use these powerful tools. This is especially true...

Environmental Engineering
The purpose of the annual Conference on environmental engineering is to pursue scientific knowledge and promote sound engineering judgement and practice in the solution of environmental...

Composite and Mixed Construction
Steel and reinforced concrete are frequently combined in composite or mixed structural systems. This combination generally results isn greater economy and safety than could be achieved...

Coastal Zone '85
Coastal Zone '85 was a multidisciplinary conference for professionals, interested citizens, and decision-makers to exchange information and views. Coastal zone management...

Making Computerized Project Control Systems Work?Background
Control systems can be considered as consisting of five major elements. These are: establish the objective or standard to be achieved-quality, maximum duration, resource utilization, maximum...

Control of the Design Process
Gilbert/Commonwealth, Inc. (G/C) was the architect-engineer for the original design of the Florida Power Corporation (FPC) Crystal River Nuclear Plant, Unit 3 (CR3) and has been involved...

 

 

 

 

Return to search