Proposed Methodology to Update Embayment Sedimentation Data for TVA Reservoirs
The purpose of this paper is to evaluate the accuracy and usefulness of bathymetric data resulting from routine fisheries and aquatic biology hydroacoustic surveys in TVA reservoirs for...

Use of Electronic Microprocessor-Based Instrumentation by the U.S. Geological Survey for Hydrologic Data Collection
The U.S. Geological Survey is acquiring a new generation of field computers and communications software to support hydrologic data-collection at field locations. The new computer hardware...

Probabilistic Aspects of Hydroproject Maintenance
A survey of operation and maintenance personnel in the hydraulic structures sector was conducted to learn about the present maintenance approach and the perception of the probabilistic...

The Benefits of U.K. Guidance for Temporary Works
In British contracts the Contractor is responsible for the design and execution of temporary works unless the Design Engineer or the Client expressly instruct how the work is to be undertaken...

Current Legal Issues Impacting Temporary Works in Construction
There are two evolving areas of legal concern to the engineer and contractor involved in any aspect of temporary construction. The interpretation and application of the Occupational Safety...

Temporary Structures for Protection and Access
Temporary Structures in Construction Projects (TSC) are utilized for three (3) purposes A. Support (of the structure being built or adjacent structures or utilities) B. Protection (of...

Productivity Applications: 3D Models & Simulation
Background. Although three-dimensional computer models have been used to some degree in practice by a few large engineering and construction firms, there has been little research into...

Wrapping up Environmental Issues in an Embankment
Contamination on a construction site can lead to increased risk of unanticipated construction delays and increased costs. In response, some owners are opting for proactive approaches to...

Project Controls on the Channel Tunnel Project
Establishing controls for a multi-facted, multi-billion dollar, privately financed, project which is run by two organisations created solely for that one project has been a major challenge....

Integrated Design and Construction Planning by Knowledge-based Systems
The main objective of this paper is to describe applications of knowledge-based systems for the improvement of planning and management efficiency at the early design stage, and to propose...

Conceptual Model for a Site Operations Control System
This study discusses a conceptual model for designing an on-site management control system. Capabilities of this proposed Site Operations Control System (SOCS) include a mechanism for...

Determining the Optimum Level of Quality Management Effort
Quality management is an essential factor in construction project success. Determining the appropriate level of quality management effort remains a challenging managerial decision. A discussion...

Construction Inspection in South Carolina
The paper will discuss the experience of the South Carolina Department of Transportation in the use of consulting engineering firms on bridge construction projects. A review of the current...

Site Layout: Where Should it Go?
Site layout is mostly treated as a task independent of other resource allocation tasks such as those that are traditionally associated with construction planning and scheduling. Yet, the...

3-D Positioning for Construction Surveying and Automation
Three-dimensional real-time positioning is a critical requirement to allow for improved surveying and autonomous vehicle control. Given such a system and a project data link, multiple...

Kinematics and Trajectory Planning for Robotic Excavation
One of the high volume and repetitive construction operations at the construction site is the excavation of soil. Automation of the excavation work requires a robotic system that is able...

Construction Documents Revised
The Engineers Joint Contract Document Committee has produced revised documents, which are available from ASCE. The committee includes ASCE, the National Society of Professional Engineers,...

Ground-Water Modeling Without Fear
Computerized ground-water modeling has leapt from the cloistered laboratory to the field project as more and more programs are written for the personal computer. These easy-to-understand...

The Soil-Rock Boundary: What is it and Where is it?
A major issue in many areas of Civil Engineering practice is the boundary between earth materials that are defined as soil and those that are defined as rock. Designers, contractors, and...

Where Does Rock Begin for Three Highway Projects?
'Where does rock begin?' was a question raised on three large highway projects in the western United States. The question was successfully answered by a variety...

 

 

 

 