Athens Siphon and Outfall
More than 130 million gallons of untreated domestic and industrial wastewater are discharged each day into the sea near Athens. To mitigate this situation, the government of Greece is...

Little Bubbles, Big Payoff
Fine poor diffusers often boost the energy-efficiency of aeration in sewage plants by 25-50%. This is important because the combined energy bill of all U.S. municipal sewage plants is...

Parking Lot Drainage Design: Gainesville, Florida
The construction of a 10-acre (4. 05 ha) parking facility (1,000-car capacity) at the University of Florida during 1984 presented the potential for increasing downstream flooding and for...

Reliability Analysis of Pumping Stations and Storage Facilities
The methodology presented for pumping stations is based upon three models: a supply model, a demand model, and a margin model. The supply model considers so-called states of a system which...

Modeling the Effect of Weirs on Reservoir Releases
A computer model was developed to examine the influence of weirs on the rise of water levels and increases in velocities from reservoir releases. The model allows for investigation of...

Capacity Expansion of Water Distribution Systems?A Case Study
Capacity expansion and necessary capital improvements to meet the water supply demand for years 1990-2020 for the U. S. Route 1 corridor development from South Brunswick to Princeton,...

The Lubbock, Texas, Land Treatment System
The land treatment system at Lubbock, Texas provides an excellent model for studying the response of a system to growth. It also provides insights and justification for current criteria...

The Briny Deep Comes Ashore
Amusement park attractions are not all fun and games. More than 10 years of planning by dozens of firms went into the Living Seas Pavilion at Walt Disney's Epcot Center. The...

Experiences of the U.S. Army Engineer District, Pittsburgh in Collecting Real-Time Water Control Data
As a result of an ever increasing need to optimize water use, 'Reservoir Regulation' has evolved into what is now known as 'Water Control Management'. In addition to the flood control...

Southeastern Drought of 1986 - Lessons Learned
An interim drought management plan for the Apalachicola-Chattahoochee-Flint (A-C-F) river basin was completed in April, 1985, just in time for testing as the drought developed. Objectives...

Sedimentation Impacts on a Pumpback Storage Facility
Concern over future sedimentation impacts at a proposed pump storage hydroelectric facility at Lake Francis Case on the Missouri River led to use of a numerical model to analyze lake hydrodynamics....

Top Projects of 1987
Five notable entries in the 1987 Outstanding Civil Engineering Achievement competition are summarized. The Keehi Interchange of the H-1 Freeway in Honolulu is only 1.9 miles long, but...

Use of Transport Models in Airport Access Analysis
This paper describes transportation models built by Wilbur Smith and Associates (WSA) as part of a study of Newark International Airport (NIA), conducted for the Port Authority of New...

Teleport: New Wave Engineering
Between $600 and $700 million will be spent on teleports now being planned in the U.S., presenting interesting challenges to civil engineers. Just as airports and seaports serve as collection...

Making Parking Pay
This paper analyzes the financing opportunities and options for providing new downtown parking garages. It identifies the present financial posture of municipal parking agencies, analyzes...

The Effects of Earthquakes on Power and Industrial Facilities and Implications for Nuclear Power Plant Design
Fifteen earthquakes, ranging from magnitude 5.2 to 8.4 on the Richter scale that have occurred in five countries since 1952, were studied. This report documents the performance of power...

Exhibits Under Fiberglass
The San Diego Convention Center, scheduled for completion in 1988, is located on 11 acres of downtown land only 150 ft from the bay. It will cost $130 million for total of 1.7 million...

Relicensing/Renewal and Coordinated Consultation
A project which has been constructed and operating for a number of years offers a substantial set of empirical data for assessing how - and by whom - the project should be continued in...

Observations and Experiences of Bulb Turbines
This article gives a short historical review of the introduction, construction and development of bulb turbine plants in Sweden. The article relates some of the experiences of the designers,...

Resolving Environmental Conflicts During Licensing?A Case History
Vischer Ferry and Crescent Dams are located on the lower Mohawk River near Albany, NY. In September 1982, the Power Authority of the State of New York filed license applications with the...

 

 

 

 