Selected Papers from Chinese Journals of Structural Engineering
This book is an initial effort to introduce selected papers from journals published by the China Civil Engineering Society to ASCE membership. The twenty papers in this volume were selected...
Seismic Engineering
Research and Practice
This volume of Seismic Engineering: Research and Practice contains papers from twenty-two sessions of the 1989 ASCE Structures Congress. These papers represent a wide-ranging interest...
Digester Gas Resource Recovery at Phoenix, Arizona
Until July 1986, the digester gas produced at this 150 million gallon per day facility, in excess of what was utilized for heating anaerobic digesters was flared. In 1983, a feasibility...
Planning for Future Hydroelectric Power: A Myth?
The hydroelectric power industry in the U.S. is authorized and regulated by the Federal Government through the Federal Energy Retgulatory Commission (FERC) under the Federal Power Act....
Computerized Resource Planning for the Central Valley Project, California
The Central Valley Project (CVP) consists of nine reservoirs and ten powerplants owned and operated by the United States Government. On an average water year basis, the CVP, with a maximum...
Computer Simulation of CVP Power Production for Integration With PG&E's Power System
The Central Valley Project (CVP) has an installed hydropower capacity of over 1800 MW. The project facilities and its preference power customers lie dispersed within the service territory...
A Microcomputer Model for Integrated Analysis of Peaking Hydro in a Thermal System
An integrated approach to simulation of a hydro system called HYDROMOD has been developed and used to place a value on additional energy-limited peaking hydro capacity added to a major...
Hydropower Stochastic Forecasting and Optimization
A microcomputer package was implemented to support real-time decisions for weekly and month-end water management at an industrial complex in the mountains of British Columbia. The rolling...
Friction Slope Computation for Mathematical Models
The behavior of the energy flow gradient as function of depth and velocity is analyzed for three flow resistance methods. In the paper, the necessary modifications introduced to the methods...
Comparison of
Manning's n values were determined for three stream channels in two complex watersheds in North Mississippi. The study covered a wide range of channel conditions and flow...
Laboratory Analysis of Hyperconcentrations
The physical and kinematic behavior of hyperconcentrations has been reviewed and a summary of recent and past developments in hyperconcentrated flow research is presented. This paper focuses...
A Frictional Resistance Model for the Analysis of Non-Point Source Pollution Processes
This study experimentally investigated the effect of a permeable bed for steady, laminar and smooth turbulent free surface flow on the Darcy-Weisbach friction factor. Flow velocities and...
Effects of Climate Change on Watershed Runoff
This paper examines forecasts of changes in watershed runoff in the Delaware River basin that result from a range of predicted effects of increased atmospheric carbon dioxide (CO2)...
Seven Oaks Dam Outlet Works Design
The U.S. Army Corps of Engineers has completed the preliminary design of the outlet works for the proposed Seven Oaks Dam. The dam is the upstream-most feature of the Corps'...
The Hydro Business: 1990 and Beyond
During the last ten years, hydroelectric generation received more and more attention as a source of reliable and economical electricity. Since the first WATERPOWER conference, the industry...
Status of Hydropower Development at Corps of Engineers Dams
The Corps of Engineers is the largest single supplier of hydroelectric power in the United States with 74 projects and an installed capacity of 20,839 MW. In addition, 33 Corps projects...
The Development and Writing of the ASCE/EPRI Hydroelectric Guidelines
In the Spring of 1989, the American Society of Civil Engineers (ASCE) and the Electric Power Research Institute (EPRI) jointly published their Civil Engineering Guidelines for Planning...
Project Evaluation?Don't Miss the Boat
The hydroelectric developer is faced with many decisions during the evaluation stage. These include determining the size of the project, financial analysis to be used, type and number...
Hydropower Development under the Utility Concept of Least Cost Utility Planning
The impetus behind 'Least Cost Utility Planning' (LCUP) is that if new generation or purchased power could be deferred, the resultant savings could be used to...
Determining Hydro Project Dependable Capacity
Traditional techniques for estimating a hydro project's dependable capacity are of limited value when evaluating a hydro project in a thermal-based power system. For such...
Return to search