Raising the Roof
For years, the Mobile County government contemplated placing both county and city governmental services under one roof. Although there were many obstacles -- political, financial and land...

Functional Highway Design
In the past, the common highway design development process used by government agencies has often failed to incorporate the lessons learned from operational experience and research. However,...

Northridge Postscript: Lesson on Steel Connections
Immediately after the Northridge earthquake in January 1994, the general concensus was that steel-framed buildings performed extremely well. Later, inspectors were surprised to find weld...

Ports '95
This proceedings, Ports '95, is a collection of the technical papers presented at the Ports '95 Conference held in...

Restructuring
America and Beyond
This proceedings, Restructuring: America and Beyond, contains the papers presented at the American Society of Civil Engineers (ASCE) Thirteenth...

Air-Supported Roof Redux
Long-span, low profile, air-supported roofs have been dramatic additions to a dozen public arenas built in the 1970s and early 1980s. The advantages of these roofs were overshadowed by...

Engineering a Place in Cyberspace
The engineering profession is only now entering the Internet�e-mail addresses are appearing on some engineers' business cards, but very few engineering or construction firms...

A Safer Earthquake Design Code After NorthRidge
Three recent killer California earthquakes have demonstrated serious deficiencies in our current building codes. As they do after all such events, officials in California and other states...

Shotcrete for Underground Support VII
This proceedings consists of papers presented at the Shotcrete for Underground Support VII Conference held in Telfs, Austria, June 11-15, 1995. It covers three broad themes concerning...

Hydraulic Design of Flood Control Channels
Technical Engineering and Design Guides, as adapted from the U.S. Army Corps of Engineers, No. 10. This guide presents procedures for the design analysis...

Bridge Design: Reality Bites Back
Many bridge engineers tend to ignore the process nature of reality, the fact that everything in this universe changes from moment to moment. When they are given the responsibility for...

Advances in Underground Pipeline Engineering II
The first international conference on Advances in Underground Pipeline Engineering was held in 1985. Some 50 authors and over 300 delegates from 20 countries took part in the presentations...

Designing for Drama
Near the Passaic River in Newark, N.J., not far from the famous Iron Bound restaurant district and Newark's Penn Station, construction crews swarm around the steel skeleton...

Shoring Up a Cultural Pillar
With the grand opening of its new addition this past spring, the Denver Central Library took a giant step to quadrupling its size and bringing the library into the information age while...

More Parking Above
Vertical expansion of six (6) new floors of parking garage on top of four (4) floors of existing structure that was built over three decades ago, adding 155,000 square foot of new structure....

Gaining Project Acceptance
Involvng every constituency early in the development of public works projects can build acceptance even when parties don't get exactly what they want. Two Illinois transportation...

Seismic Design Guide for Natural Gas Distributors
This monograph presents an overview of the sources and geographical distribution of earthquakes, identifies earthquake hazards, and gives the implications of these hazards to gas distribution...

Rock Steady
Heavily damaged during the Loma Prieta earthquake, Oakland City Hall had to be repaired and retrofitted. Now Oakland boasts the tallest seismically isolated building in the world. The...

Power Booster
With many utilities caught in a vise between semiobsolete facilities and demands for cleaner power, the $578 million Manchester Street repowering project is setting an example for an aging...

Documenting Design-Build
For engineers more familiar with the traditional design�bid�build process, design�build might present some unforeseen risks and responsibilities. To define and allocate these, the Engineers...

 

 

 

 

Return to search