A Framework for Collaborative Distributed Facility Engineering
A framework for collaborative distributed facility engineering is presented. This framework is an extension of an agent-based framework for facility design software integration. The focal...

Computer Analysis of Lateral Loading in Wood-Framed Structures
Building codes and design techniques associated with single-family housing need to incorporate advances in architecture and construction so that the traditional life-safety building codes...

Optimal Markup Policy in Sequential Competitive Bidding
Construction firms encounter resource constrains in their business operations. However, current competitive bidding models fail to consider the impact of a firm's constrained resources...

Interactive Cost Estimating During Design
This paper describes a model, called the Automated Interactive Cost Estimating System (AICES), which gives users access to reinforced concrete cost information that is sensitive to variations...

Constraint Management on Distributed AEC Configurations
Architecture, Engineering and Construction (AEC) design processes involve the participation of many designers who may be working independently in geographically distinct locations. We...

Computer-Assisted Instruction in Civil Engineering
Computer-assisted instruction (CAI) software offers several advantages over traditional classroom instruction which makes it a useful addition to any curriculum, and the area is rapidly...

Software Interface in Engineering Applications
The evolution of personal computer (PC) software has reached the point where most major types of software will interact. The ability of PC programs to share various texts, graphics and...

Application of OOP in Developing Finite Element Analysis Programs Using C++
Using the object oriented programming technique, a library of object classes has been developed and implemented using C+PLU2 for easy generation of finite element analysis programs. A...

Computer Use in Claims Analysis -- Roundtable Discussion
Preparation or defense of construction claims is inherently time consuming and often counter-productive. This outline discusses some tools currently used in the construction industry to...

Management Information System Application on a Multi-Million Overseas Project
Project Management Information Systems (PMIS) provides improved data quality, consistency, timeliness, and reporting flexibility and improved project teamwork. Project managers have a...

The Integrated Systems Approach to Facilities Management
This paper investigates the condition and use of the systems for facilities management and discusses process and considerations for improving the long term value of integrated facilities...

Displacement of Landmark Building Resulting from Adjacent Construction Activities
This paper describes the observations and presents comments related to the measurement of settlement and the avoidance of damage to a historic structure in the City of New York from adjacent...

Settlement of a 15-Meter Deep Fill Below a Building
The site for a building in western Pennsylvania was undermined, with the mine base about 15 m below planned final grade. Rock above the mine was highly fractured and of poor quality, indicating...

The Behavior of a Building with Shallow Foundations on a Stiff Lateritic Clay
The use of shallow foundations for buildings in Sao Paulo, either on soils of the Tertiary Sedimentary Basin of Sao Paulo (TSBSP) or on those of saprolitic origin is not as frequent as...

Case History of a Collapsible Soil Fill
Collapse settlement of a deep compacted fill led to damage of a group of condominium units. The fill consisted of a highly heterogeneous mixture of coarse- to fine-grained soil containing...

Tolerable Deformations
Current criteria for tolerable movements of buildings, bridges and other structures are reviewed. Tolerable values of total and differential settlement, relative rotation, relative deflection...

Reliability Analysis of Water Distribution Systems
The aging and deterioration of our water supply infrastructure have resulted in performance deficiencies. Limited budgets require that resources for maintenance and rehabilitation be allocated...

Risk-Based Budgeting for Maintenance Dredging
The U.S. Army Corps of Engineers must estimate the budget required to conduct maintenance dredging at hundreds of sites across the country. The amount of funds needed to do the maintenance...

Uncertainty versus Computer Response Time
Interactive on-line presentation of risk analysis results with immediate `what if' capability is now possible with available microcomputer technology. This can provide an effective means...

Risk Simulation Model for Rehabilitation Studies
The U.S. Army Corps of Engineers is required to analyze major rehabilitation proposals for all facilities using risk-based benefit-cost analysis techniques. Existing spreadsheet-based...

 

 

 

 

Return to search