Monitoring Performance of Full Scale Structures
General Physics Services Corporation (GPSC) of Columbia, Maryland has developed a device for the remote long-term monitoring of full scale structures, such as highway bridges. This patented...

Full Scale Dynamic Monitoring of Highway Bridges
Sensitivity of identified modal properties by physical testing is critical for automated monitoring of bridge structural condition. It is investigated here considering flexure modes and...

Some Considerations for Remedial Grouting for Seepage Control
The inadequate performance of grout curtains and the consequent need for remedial and supplementary grouting of dam foundations probably arises, in essentially all cases, from a combination...

Rehabilitation of Cracked Embankment Dams
Cracking is a common phenomenon in many earth embankment dams and especially those small to medium size dams constructed on compressible soil foundations. Collapsible soil conditions,...

Liquefaction Potential of Gravelly Soils in Dams
Gravelly soils are common components of embankment dams and their foundations. When such soils have been placed or deposited in a loose condition and are saturated, they are potentially...

Liquefaction Evaluation by Seismic Potential Procedure
Empirical procedures in common use for liquefaction evaluation employ information from a variety of sources in order to evaluate whether or not a site will undergo liquefaction. The information...

Reduction of Liquefaction Potential by Compaction Grouting at Pinopolis West Dam, SC
A previous 1984 field study and subsequently published paper (Salley et.al., 1987) described the seismic design background and evaluated the potential success of compaction grouting to...

Improving Dam Safety Using a Fin Drain
Bloemhoek Dam is an embankment dam with a maximum height of 21 m, which leaked severely after first filling in 1978. This leakage resulted in the development of `boils' over a portion...

Graham Lake Dam Remedial Measures Project
Graham Lake Dam consists of a 550-foot long earth embankment and an 80-foot long concrete spillway. Several concerns were identified during project inspections including limited spillway...

Remedial Design and Construction to Improve a Sliding Embankment
The paper describes the studies made to identify the nature of possible remedial measures such as improved drainage, removal of the weak clay layer or a provision of a buttressed dam....

Coolidge Dam Abutment Stability and Stabilization
This paper focuses on left abutment stability assessments and stabilization measures at Coolidge Dam, Arizona. Initial assessment of abutment stability was based on limited rock strength...

Seismic Stability Modification Designs for Embankment Dams
The Bureau of Reclamation (Reclamation) has recently designed rehabilitations for four embankment dams to ensure their seismic stability. A fifth project is scheduled for construction....

Seismic Rehabilitation of Sardis Dam
Extensive subsurface investigation of the embankment dam revealed the existence of a weak layer of silt and soft clay in the original topstratum clay underlaying the upstream shell of...

IVHS: The Invisible Revolution
Federal funding for intelligent vehicle highway systems has increased a hundredfold since 1989, from $2 million to almost $200 million. Transportation planners are looking increasingly...

Recycled Roads
The movement to recycle wastes in highways appears to be gathering momentum nationwide. Rubber from old tires, wood chips, reclaimed asphalt pavement, fly ash, scrap plastic, mining wastes...

Driving Under a Construction Site
Throughout the summer of 1992, vehicles passed unimpeded through one of the most heavily traveled intersections in Los Angeles County as construction proceeded on a concrete light-rail...

Supply-Side Solutions
Although the crumbling bridge infrastructure has received much attention in the press and the engineering community over the past few years, the number of structurally deficient bridges...

Predicting Pollution
For urban areas struggling to meet the requirements of the 1990 Clean Air Act as well as state air-quality mandates, accurate forecasting of mobile emissions is critical to evaluating...

Marginal Overweight Operating Scenario for DOE's Initiative I Highway Casks
This paper assesses the potential transport of high-capacity Initiative I highway casks under development by the Office of Civilian Radioactive Waste Management (OCRWM) as permitted marginal...

Alternatives Analysis Using Two-Dimensional Modeling for the Owensboro Bridge and Approaches
The Federal Highway Administration plans to design and construct a new bridge over the Ohio River near Owensboro Kentucky. A hydraulic model with two-dimensional capabilities was utilized....

 

 

 

 

Return to search