Airport on the Move
The Dallas/Fort Worth International Airport (DFW) is building an automated people mover (APM) system as part of a five-year, $2.6-billion capital development program that includes three...
Rebuilding America's Infrastructure
During the years immediately following World War II, the United States built the greatest infrastructure in the modern world. As we move into the 21st centruy, however, we find that this...
A Constructed Wetland for Wastewater Treatment in the Coachella Valley, Indio, California
The Coachella Valley Wild Bird Center (CVWBC) proposed a wetland habitat site on 22 acres property in India, California, under lease from Valley Sanitary District. The District currently...
Taking Treatment to the Extremes
Designing a wastewater treatment facility that meets current environmental guidelines can be challenging enough. But designing it so it can be shipped, constructed, operated, and maintained...
Towering Achievement
A new headquarters complex being constructed for Goldman Sachs in New York City will rise where a Colgate factory once stood. The complex will incude a high-rise main building, a mixed-use...
Urban Planning and Development Applications of GIS
Sponsored by the Geographic Information Systems Subcommittee of the Urban Planning and Development Division of ASCE. This report provides the most...
Environmental Technology Verification Report for Ammonia Recovery Process
Prepared by the Environmental Technology Evaluation Center (EvTEC), a CERF Service Center. This report describes the nature and scope of an environmental...
Solid Ground
The densely populated island nation of Singapore has no choice but to be creative in devising strategies for disposing of solid waste. With its tiny land mass and the fact that its single...
Desert Wetlands
Two constructed wetlands demonstration projects in the Imperial Valley of California are being designed to help improve the water quality of the New River, which originates in Mexico and...
On the Question of Accepting Work Outside One's Field of Expertise: An Ethical Fail Safe
The winner of the Daniel W. Mead Prize for ethical writing by a student discusses the history of the development of ASCE's code of ethics. Although it may be legal for civil...
The SPRP Project: An Overview
The National Science Foundation's Office of Polar Programs (OPP), the lead agency for the U.S. Antarctic Program, has begun construction of a replacement station for the Amundsen-Scott...
The Rationale for Above-Surface Facilities
The redevelopment of the U.S. Amundsen-Scott South Pole Station�currently in the beginning phases of construction�will include the largest and most ambitious example of an elevated station...
Remediation Lessons Learned
Within the past few years a large number of environmental remediation projects have been completed that are now in postclosure monitoring. What lessons can be learned from these projects?...
Water, Water, Everywhere (Available in Geoenvironmental special issue only)
The discovery of extensive contamination just prior to construction of an underground library storage facility prompted engineers from the Minneapolis-based firms CNA Consulting Engineers...
Metal Building Systems: A New Look
The use of metal building systems in low-rise, non-residential construction under 150,000 square feet has grown from less than 50 percent in 1986 to almost 70 percent today. Such systems...
Energy Unleashed
The U.S. Army Corps of Engineers discharges a mean daily flow of 2,000 cu ft/s (57 m�/s) under a gross head of 280 ft (85 m) through four Howell-Bunger valves at the Summersville Dam in...
A Statewide Economic Optimization Model for California II: Model and Results
(No paper) Traditionally simulation models have been used for multi-reservoir operation studies. More recently deterministic optimization models have been used to identify promising alternatives...
Del Webb's Innovative Approach to Master-Planned Community Development
(No paper) The Del Webb Corporation is currently building a master planned development on the northern edge of Maricopa County. The development plan includes a water campus housing a water...
Stepwise Flood Routing for Gated Reservoirs and Conjunctive Optimization of Hydroelectricity Income with Flood Losses
A six-stage operation policy for routing of flood hydrographs of return periods from 1.01 year up to the Probable Maximum Flood (PMF) for dams having gated spillways is suggested. The...
A Risk-Based Approach to Subsurface NORM Disposal
(No paper) Naturally occurring radioactive materials (NORM) has become an environmental concern for the petroleum industry. NORM scales results when naturally occurring radium co-precipitates...