Evaluation Findings of the All Sign Products, Inc. Polycarbonate Stop Sign
Prepared by the Highway Innovative Technology Evaluation Center, a CERF Service Center. This report presents the HITEC evaluation of a plastic stop...

Watching Under Boston
Managing the daily operations of Boston's Central Artery/Ted Williams Tunnel project requires integrating a variety of hi-tech systems to ensure efficient traffic flow. The...

LAX Now Towers in Style (Available only in Structural Engineering Special Issue)
Three years and three major building code agencies later, the $21 million Los Angeles Airport control tower stands as a testament to art, architecture and innovative engineering. Completed...

Catchy Culverts
Franklin County, Ohio, installed box culverts in Norman Ditch to prevent flooding of surrounding homes, streets and sewer lines after heavy storms. The design team, given tight deadlines...

Mapping Convergence: GIS Joins the Enterprise
While utilities and telecommunications companies have led the way in maximizing GIS's potential, some progressive municipalities are now incorporating GIS into every aspect of their daily...

A Signature Bridge for Boston (Available only in Structural Engineering Special Issue)
The first hybrid steel and concrete span in America will debut over the Charles River in Boston, carrying ten lanes of interstate traffic and serving as an elegant capstone to the largest...

Traffic Congestion and Traffic Safety in the 21st Century
Challenges, Innovations, and Opportunities
This proceedings, Traffic Congestion and Traffic Safety in the 21st Century: Challenges, Innovations, and Opportunities, contains papers presented...

Road to the Future
Construction of the San Joaquin Hills Transportation Corridor, winner of the 1997 ASCE Outstanding Civil Engineering Award of Merit, resulted in one of the most successful public/private...

Scandinavia's International Connection (Available only in Structural Engineering Special Issue)
The 7.8-km-long cable-stayed �resund Bridge, the centerpiece of the first road and rail link between Scandinavia and Europe, is the third and final link of the 15.8 km Oresund Link. The...

? for Roofs (Available only in Structural Engineering special issue)
A roof replacement project at a hospital in Huntsville, TX, has to be compatible with the existing structure to meet insurance requirements and withstand the hot summers. The replacement...

Intelligent Transportation Education
The comprehensive traffic surveillance study for the New York State Thruway Authority (NYSTA) began in late September 1993. The project involved the study of available traffic management...

State of Delaware-Scour Evaluation Program
The Delaware Department of Transportation (DelDOT) is evaluating the potential for scour at bridges which have a National Bridge Inventory (NBI)-Item 113 Code Rating of 6 (scour susceptible)....

Analysis of Exceptional Meteorological Conditions on July and August in Conakry
Conakry is a zone that receives more precipitation than other countries in West Africa. Sometimes the quantity is more than 4,000 mm per year. Strong rainfalls are observed between July...

Canal Control and Automation for the Central District System
The Central Nebraska Public Power and Irrigation District system provides irrigation and hydropower benefits in south-central Nebraska. Because of its complexity, the system relies heavily...

Hydrodynamic Changes Associated with Navigation Traffic on the Upper Mississippi River System
Research has been conducted at the Illinois State Water Survey for the last five to seven years to collect field data from the Illinois and Mississippi Rivers to determine the extent and...

Improving the Speed of Double Lockages
The size of tug and barge combinations on the Upper Mississippi River and Illinois Waterway frequently exceed the dimensions of the lock chambers they must pass through. The locks on these...

Navigation Lock Improvements
All commercial barge traffic on the Upper Mississippi River and Illinois Waterway must pass through a system of locks designed and built in the 1930s and 40s. Many of the locks on these...

Applications of Advanced Technologies in Transportation Engineering
This proceedings, Applications of Advanced Technologies in Transportation Engineering, consists of extended abstracts of papers presented at...

Boston's Home Run
The $1.3 billion Ted Williams Tunnel, the first part of Boston's Central Artery/Third Harbor Tunnel Project to be completed, has been designated the Outstanding Civil Engineering...

HOV Fix on I-66
Construction has been under way since December 1993 on a project to widen and add a high occupancy vehicle lane on a 12 mi section of Interstate 66 from Route 50 to the City of Manassas...

 

 

 

 

Return to search