Incorporating Climate Science into Engineering Practice
This section provides a review of engineering practices and discusses how engineers canconsider climate change in their practice, given the uncertainty of the future....

Civil Engineering Sectors
This section reviews the challenges for engineering practice posed by climate variability for the following traditional infrastructure sectors and special themes....

Research, Development, and Demonstration Needs
Research, development and demonstration (RDD) is needed to advance recommended civil engineering practices and standards in order to effectively address climate change impacts. Wilbanks...

A Foundation Engineering Trip Down the Mississippi: Foundations for Mississippi River Bridges from Minnesota to Louisiana
Huckleberry Finn had his adventure, but for those interested in foundation engineering, this article will float you down the Mississippi River on your own encounter with the many bridges...

Screw Piles and Helical Anchors: 180 Years of Use in Geotechnical Engineering
Since 1836, screw piles and screw cylinders have been used successfully throughout the world to support a variety of large-scale, civil engineering structures. Their development and use...

Evaluating Bridges With Unknown Foundations for Susceptibility to Scour: North Carolina Applies Risk-Based Guidelines to Over 3,750 Bridges
Scour occurs when flowing water removes erodible material such as sand and rock. For bridges over water, scour affects the stability of pier and abutment foundations and contributes to...

Bill Shannon and Stan Wilson: Geotechnical Pioneers with a 60-Year Legacy
Starting a business today can pose an array of challenges�planning, financial, legal, and licensing among them. But at its core, a company's founders must be dedicated to...

Geotextile Tube Dewatering
Geotextile tubes are made of high-strength, permeable geotextile that, when filled with a slurry, allow water to drain from the tubes while retaining the solids. They can be prefabricated...

Geosynthetic Materials Help Build Optimized Infrastructure
In recent years, the world has begun to realize the negative impacts that limited infrastructure can have on economic growth and the well-being of humankind. Our infrastructure challenges...

Porous Asphalt and Permeable Friction Course Overlays
Porous asphalt typically consists of conventional warm mix asphalt (WMA) or hot mix asphalt (HMA) with significantly reduced fines resulting in an open-graded mixture that allows water...

Permeable Interlocking Concrete Pavement (PICP)
Permeable interlocking concrete pavement (PICP) consists of (impervious) manufactured concrete units that form permeable voids and joints, when assembled into a laying pattern. The openings...

Grid Pavement
Open grid pavements consist of concrete or plastic units with large surface openings filled with a permeable joint material, typically small aggregate (ASTM No. 8 or No. 89), sand, or...

Alternative Technologies
In recent years, new permeable pavement product variations have entered the market. This chapter describes general characteristics for several emerging products. The following types of...

Appendix A: Common Concerns Regarding Permeable Pavements Fact Sheet
Back matter pages come after the papers or chapters in a published work. This back matter contains common concerns regarding permeable pavements fact sheet....

General
Design of Latticed Steel Transmission Structures specifies requirements for the design, fabrication, and testing of members and connections for electrical transmission structures. These...

Scope
This standard guideline covers planning, design, pipe materials, and construction of microtunneling. The term microtunneling is defined as a trenchless construction method for installing...

Project Layout
Microtunneling projects should be laid out with attention to the benefits and constraints unique to this construction process. The following recommendations address some of these concerns:...

Contract Documents
As with any civil works project, the bid and contract documents prepared by the owner and the engineer should provide the contractor with the necessary information to prepare bids, to...

Pipe Characteristics
Microtunneling pipe should meet the following general requirements: Circular shape with a flush outside surface (including at the joints); Strength sufficient to withstand both the installation...

Pipe Design
The pipes and joints, once installed, must be capable of safely withstanding, for the project design life, all in-use service loads, including those associated with the following factors:...

 

 

 

 

Return to search